相关论文: After-sales services during an asset's lifetime: c…
This paper develops maintenance policies for a system under condition monitoring. We assume that a number of defects may develop and the degradation process of each defect follows a gamma process, respectively. The system is inspected…
Motivated by the cost savings that can be obtained by sharing resources in a network context, we consider a stylized, yet representative model, for the coordination of maintenance and service logistics for a geographic network of assets.…
Engineered and infrastructure systems deteriorate (e.g., loss capacity) as a result of adverse environmental or external conditions. Modeling deterioration is essential to define optimum design strategies and inspection and maintenance…
The economic life of an asset is the optimum length of its usefulness, which is the moment that the asset's expenses are minimum. In this paper, the economic life of physical assets, such as industry machine and equipment, can be…
In this work, we study an upgrading scheme for online resource allocation problems. We work in a sequential setting, where at each round a request for a resource arrives and the decision-maker has to decide whether to accept it (and thus,…
Considering the close interaction between spare parts logistics and maintenance planning, this paper presents a model for joint optimization of multi-location spare parts supply chain and condition-based maintenance under predictive and…
The energy and material processing industries are traditionally characterized by very large-scale physical capital that is custom-built with long lead times and long lifetimes. However, recent technological advancement in low-cost…
We consider a scenario where a system experiences a disruption, and the states (representing health values) of its components continue to reduce over time, unless they are acted upon by a controller. Given this dynamical setting, we…
A model among many may only be best under certain states of the world. Switching from a model to another can also be costly. Finding a procedure to dynamically choose a model in these circumstances requires to solve a complex estimation…
Most existing research about complex systems maintenance assumes they consist of the same type of components. However, systems can be assembled with heterogeneous components (for example degrading and non-degrading components) that require…
We consider a model where an agent has a repeated decision to make and wishes to maximize their total payoff. Payoffs are influenced by an action taken by the agent, but also an unknown state of the world that evolves over time. Before…
Motivated by original equipment manufacturer (OEM) service and maintenance practices we consider a single component subject to replacements at failure instances and two types of preventive maintenance opportunities: scheduled, which occur…
Rental-based business models and increasing sustainability requirements intensify the need for efficient strategies to manage large machine and vehicle fleet renewal and upgrades. Optimized fleet upgrade strategies maximize overall utility,…
An optimization model has been formulated and solved to determine on-condition failure thresholds and inspection intervals for multi-component systems with each component experiencing multiple failure processes due to simultaneous exposure…
Any firm whose business strategy has an exposure constraint that limits its potential gain naturally considers expansion, as this can increase its exposure. We model business expansion as an enlargement of the opportunity set for business…
We consider an outsourcing problem where a software agent procures multiple services from providers with uncertain reliabilities to complete a computational task before a strict deadline. The service consumer requires a procurement strategy…
Enterprise workloads usually call for an uptime service level agreement (SLA) at the pain of contractual penalty in the event of slippage. Often, the strategy is to introduce ad-hoc HA (High Availability) mechanisms in response. Implemented…
Battery Asset Management problem determines the minimum cost replacement schedules for each individual asset in a group of battery assets that operate in parallel. Battery cycle life varies under different operating conditions including…
Maximizing long-term rewards is the primary goal in sequential decision-making problems. The majority of existing methods assume that side information is freely available, enabling the learning agent to observe all features' states before…
The goal of a sequential decision making problem is to design an interactive policy that adaptively selects a group of items, each selection is based on the feedback from the past, in order to maximize the expected utility of selected…