相关论文: Scheduling on (Un-)Related Machines with Setup Tim…
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal…
In this paper, we consider the problem of scheduling an application on a parallel computational platform. The application is a particular task graph, either a linear chain of tasks, or a set of independent tasks. The platform is made of…
We study the scheduling problem of makespan minimization while taking machine conflicts into account. Machine conflicts arise in various settings, e.g., shared resources for pre- and post-processing of tasks or spatial restrictions. In this…
Recently, the problem of multitasking scheduling has attracted a lot of attention in the service industries where workers frequently perform multiple tasks by switching from one task to another. Hall, Leung and Li (Discrete Applied…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
This paper presents improved approximation algorithms for the problem of multiprocessor scheduling under uncertainty, or SUU, in which the execution of each job may fail probabilistically. This problem is motivated by the increasing use of…
We study ordinal makespan scheduling on small numbers of identical machines, with respect to two parallel solutions. In ordinal scheduling, it is known that jobs are sorted by non-increasing sizes, but the specific sizes are not known in…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
Consider the classical Min-Sum Set Cover problem: We are given a universe $\mathcal{U}$ of $n$ elements and a collection $\mathcal{S}$ of $k$ subsets of $\mathcal{U}$. Moreover, a cost function is associated with each set. The goal is to…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
In the paper we consider the problem of scheduling $n$ identical jobs on 4 uniform machines with speeds $s_1 \geq s_2 \geq s_3 \geq s_4,$ respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are…
We are concerned with the problem of scheduling $n$ jobs onto $m$ identical machines. Each machine has to be in operation for a prescribed time, and the objective is to minimize the total machine working time. Precisely, let $c_i$ be the…
The problem of scheduling jobs on parallel machines (identical, uniform, or unrelated), under incompatibility relation modeled as a block graph, under the makespan optimality criterion, is considered in this paper. No two jobs that are in…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
This paper studies a generalized busy-time scheduling model on heterogeneous machines. The input to the model includes a set of jobs and a set of machine types. Each job has a size and a time interval during which it should be processed.…