相关论文: Scheduling on (Un-)Related Machines with Setup Tim…
We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
We revisit two well-studied scheduling problems in the unrelated machines setting where each job can have a different processing time on each machine. For minimizing total weighted completion time we give a 1.45-approximation, which…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. This problem is…
Given n jobs with release dates, deadlines and processing times we consider the problem of scheduling them on m parallel machines so as to minimize the total energy consumed. Machines can enter a sleep state and they consume no energy in…
We consider the following special case of minimizing makespan. A set of jobs $J$ and a set of machines $M$ are given. Each job $j \in J$ can be scheduled on a machine from a subset $M_j$ of $M$. The processing time of $j$ is the same on all…
We consider scheduling on identical and unrelated parallel machines with job assignment restrictions. These problems are NP-hard and they do not admit polynomial time approximation algorithms with approximation ratios smaller than $1.5$…
We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…
The task of scheduling jobs to machines while minimizing the total makespan, the sum of weighted completion times, or a norm of the load vector, are among the oldest and most fundamental tasks in combinatorial optimization. Since all of…
We study approximation algorithms for the problem of minimizing the makespan on a set of machines with uncertainty on the processing times of jobs. In the model we consider, which goes back to~\cite{BertsimasS03}, once the schedule is…
We study the scheduling problem on unrelated machines in the mechanism design setting. This problem was proposed and studied in the seminal paper (Nisan and Ronen 1999), where they gave a 1.75-approximation randomized truthful mechanism for…
Interval scheduling is a basic problem in the theory of algorithms and a classical task in combinatorial optimization. We develop a set of techniques for partitioning and grouping jobs based on their starting and ending times, that enable…
We consider the Generalized Makespan Problem (GMP) on unrelated machines, where we are given $n$ jobs and $m$ machines and each job $j$ has arbitrary processing time $p_{ij}$ on machine $i$. Additionally, there is a general symmetric…
In this paper we consider the problem of scheduling on parallel machines with a presence of incompatibilities between jobs. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of…
Multicore shared cache processors pose a challenge for designers of embedded systems who try to achieve minimal and predictable execution time of workloads consisting of several jobs. To address this challenge the cache is statically…
A moldable job is a job that can be executed on an arbitrary number of processors, and whose processing time depends on the number of processors allotted to it. A moldable job is monotone if its work doesn't decrease for an increasing…
This paper establishes performance guarantees for online algorithms that schedule stochastic, nonpreemptive jobs on unrelated machines to minimize the expected total weighted completion time. Prior work on unrelated machine scheduling with…
Malleable scheduling is a model that captures the possibility of parallelization to expedite the completion of time-critical tasks. A malleable job can be allocated and processed simultaneously on multiple machines, occupying the same time…
We consider the problem of efficiently scheduling jobs with precedence constraints on a set of identical machines in the presence of a uniform communication delay. Such precedence-constrained jobs can be modeled as a directed acyclic graph,…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…