We consider the problem of scheduling a set of jobs on a set of identical parallel machines, with the aim of minimizing the total weighted completion time. The problem has been solved in the literature with a number of mathematical…
We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
In this work, we study the computational (parameterized) complexity of $P \mid r_j, p_j=p \mid \sum_j w_j U_j$. Here, we are given $m$ identical parallel machines and $n$ jobs with equal processing time, each characterized by a release…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
We study the problem of scheduling equal-length jobs with release times and deadlines, where the objective is to maximize the number of completed jobs. Preemptions are not allowed. In Graham's notation, the problem is described as…
In this paper we consider a combination of the joint replenishment problem (JRP) and single machine scheduling with release dates. There is a single machine and one or more item types. Each job has a release date, a positive processing…
This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms…
We consider the problem of scheduling jobs with equal lengths on uniform parallel batch machines with non-identical capacities where each job can only be processed on a specified subset of machines called its processing set. For the case of…
This paper considers scheduling on identical machines. The scheduling objective considered in this paper generalizes most scheduling minimization problems. In the problem, there are $n$ jobs and each job $j$ is associated with a…
We study the fundamental scheduling problem $1\mid r_j\mid\sum w_j U_j$: schedule a set of $n$ jobs with weights, processing times, release dates, and due dates on a single machine, such that each job starts after its release date and we…
The $1|B,r_j|\sum w_jU_j$ scheduling problem takes as input a batch setup time $\Delta$ and a set of $n$ jobs, each having a processing time, a release date, a weight, and a due date; the task is to find a sequence of batches that minimizes…
In parallel machine scheduling, we are given a set of jobs, together with a number of machines and our goal is to decide for each job, when and on which machine(s) it should be scheduled in order to minimize some objective function.…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
In this paper we study a simple extension of the total weighted flowtime minimization problem for single and identical parallel machines. While the standard problem simply defines a set of jobs with their processing times and weights and…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines.…