中文
相关论文

相关论文: On The Parameterized Tractability of the Just-In-T…

200 篇论文

The MULTICUT problem, given a graph G, a set of terminal pairs T={(s_i,t_i) | 1 <= i <= r} and an integer p, asks whether one can find a cutset consisting of at most p non-terminal vertices that separates all the terminal pairs, i.e., after…

数据结构与算法 · 计算机科学 2012-02-28 Stefan Kratsch , Marcin Pilipczuk , Michał Pilipczuk , Magnus Wahlström

We study the linearizability monitoring problem, which asks whether a given concurrent history of a data structure is equivalent to some sequential execution of the same data structure. In general, this problem is $\textsf{NP}$-hard, even…

编程语言 · 计算机科学 2026-05-26 Lee Zheng Han , Umang Mathur

The Set Packing problem is, given a collection of sets $\mathcal{S}$ over a ground set $\mathcal{U}$, to find a maximum collection of sets that are pairwise disjoint. The problem is among the most fundamental NP-hard optimization problems…

计算复杂性 · 计算机科学 2023-02-28 Ameet Gadekar

We consider the $1||\sum w_J U_j$ problem, the problem of minimizing the weighted number of tardy jobs on a single machine. This problem is one of the most basic and fundamental problems in scheduling theory, with several different…

数据结构与算法 · 计算机科学 2024-01-04 Klaus Heeger , Danny Hermelin

The task of scheduling jobs to machines while minimizing the total makespan, the sum of weighted completion times, or a norm of the load vector, are among the oldest and most fundamental tasks in combinatorial optimization. Since all of…

数据结构与算法 · 计算机科学 2020-09-25 Martin Koutecký , Johannes Zink

This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms…

数据结构与算法 · 计算机科学 2026-01-27 Benjamin Moseley , Kirk Pruhs , Marc Uetz , Rudy Zhou

Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing…

数据结构与算法 · 计算机科学 2019-10-22 Alexander Mäcker , Friedhelm Meyer auf der Heide , Simon Pukrop

In this paper we study a proportionate flow shop of batching machines with release dates and a fixed number $m \geq 2$ of machines. The scheduling problem has so far barely received any attention in the literature, but recently its…

数据结构与算法 · 计算机科学 2020-11-30 Christoph Hertrich , Christian Weiß , Heiner Ackermann , Sandy Heydrich , Sven O. Krumke

We study a variant of Min Cost Flow in which the flow needs to be connected. Specifically, in the Connected Flow problem one is given a directed graph $G$, along with a set of demand vertices $D \subseteq V(G)$ with demands $\mathsf{dem}: D…

数据结构与算法 · 计算机科学 2021-07-21 Isja Mannens , Jesper Nederlof , Céline Swennenhuis , Krisztina Szilágyi

The workflow satisfiability problem is concerned with determining whether it is possible to find an allocation of authorized users to the steps in a workflow in such a way that all constraints are satisfied. The problem is NP-hard in…

密码学与安全 · 计算机科学 2012-10-16 J. Crampton , R. Crowston , G. Gutin , M. Jones , M. S. Ramanujan

A mixed shop is a manufacturing infrastructure designed to process a mixture of a set of flow-shop jobs and a set of open-shop jobs. Mixed shops are in general much more complex to schedule than flow-shops and open-shops, and have been…

数据结构与算法 · 计算机科学 2018-09-18 Longcheng Liu , Yong Chen , Jianming Dong , Randy Goebel , Guohui Lin , Yue Luo , Guanqun Ni , Bing Su , An Zhang

We provide new (parameterized) computational hardness results for Interval Scheduling on Unrelated Machines. It is a classical scheduling problem motivated from just-in-time or lean manufacturing, where the goal is to complete jobs exactly…

计算复杂性 · 计算机科学 2022-06-28 Danny Hermelin , Yuval Itzhaki , Hendrik Molter , Dvir Shabtay

We study scheduling problems on a machine with varying speed. Assuming a known speed function we ask for a cost-efficient scheduling solution. Our main result is a PTAS for minimizing the total weighted completion time in this setting. This…

数据结构与算法 · 计算机科学 2014-03-06 Nicole Megow , José Verschae

In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…

最优化与控制 · 数学 2014-12-17 Anna Romanova

We study the problem of exchange when 1) agents are endowed with heterogeneous indivisible objects, and 2) there is no money. In general, no rule satisfies the three central properties Pareto-efficiency, individual rationality, and…

计算机科学与博弈论 · 计算机科学 2018-03-08 William Phan , Christopher Purcell

This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the…

计算复杂性 · 计算机科学 2021-03-16 Klaus Jansen , Alexandra Lassota , Marten Maack , Tytus Pikies

In this paper we consider the open shop scheduling problem where the jobs have delivery times. The minimization criterion is the maximum lateness of the jobs. This problem is known to be NP-hard, even restricted to only 2 machines. We…

数据结构与算法 · 计算机科学 2017-06-08 Imed Kacem , Christophe Rapine

The NP-hard general factor problem asks, given a graph and for each vertex a list of integers, whether the graph has a spanning subgraph where each vertex has a degree that belongs to its assigned list. The problem remains NP-hard even if…

数据结构与算法 · 计算机科学 2015-03-19 Gregory Gutin , Eun Jung Kim , Arezou Soleimanfallah , Stefan Szeider , Anders Yeo

We study the parameterized complexity of separating a small set of vertices from a graph by a small vertex-separator. That is, given a graph $G$ and integers $k$, $t$, the task is to find a vertex set $X$ with $|X| \le k$ and $|N(X)| \le…

数据结构与算法 · 计算机科学 2013-10-02 Fedor V. Fomin , Petr A. Golovach , Janne H. Korhonen

The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…

最优化与控制 · 数学 2023-06-16 Nodari Vakhania , Frank Werner , Alejandro Reynoso