We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We revisit two well-studied scheduling problems in the unrelated machines setting where each job can have a different processing time on each machine. For minimizing total weighted completion time we give a 1.45-approximation, which…
We revisit the unrelated machine scheduling problem with the weighted completion time objective. It is known that independent rounding achieves a 1.5 approximation for the problem, and many prior algorithms improve upon this ratio by…
We study approximation algorithms for scheduling problems with the objective of minimizing total weighted completion time, under identical and related machine models with job precedence constraints. We give algorithms that improve upon many…
We give a 1.488-approximation for the classic scheduling problem of minimizing total weighted completion time on unrelated machines. This is a considerable improvement on the recent breakthrough of $(1.5 - 10^{-7})$-approximation (STOC…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the…
We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing…
One of the most important open problems in machine scheduling is the problem of scheduling a set of jobs on unrelated machines to minimize the makespan. The best known approximation algorithm for this problem guarantees an approximation…
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on…
This paper addresses the challenging scheduling problem of coflows with release times, with the objective of minimizing the total weighted completion time. Previous literature has predominantly concentrated on establishing the scheduling…
We give a $(2 + \epsilon)$-approximation algorithm for minimizing total weighted completion time on a single machine under release time and precedence constraints. This settles a recent conjecture made in [18]
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
We present a $\sqrt{e}/(\sqrt{e}-1)$-approximation algorithm for the nonpreemptive scheduling problem to minimize the total weighted completion time of jobs on a single machine subject to release dates and precedence constraints. The…
We study the scheduling problem on unrelated machines in the mechanism design setting. This problem was proposed and studied in the seminal paper (Nisan and Ronen 1999), where they gave a 1.75-approximation randomized truthful mechanism for…
The Restricted Assignment Problem is a prominent special case of Scheduling on Parallel Unrelated Machines. For the strongest known linear programming relaxation, the configuration LP, we improve the non-constructive bound on its…
This paper establishes performance guarantees for online algorithms that schedule stochastic, nonpreemptive jobs on unrelated machines to minimize the expected total weighted completion time. Prior work on unrelated machine scheduling with…