We consider the two-parallel machines scheduling problem, with the aim of minimizing the maximum lateness and the makespan. Formally, the problem is defined as follows. We have to schedule a set J of n jobs on two identical machines. Each…
We study classic scheduling problems on uniformly related machines. Efficient polynomial time approximation schemes (EPTAS's) are fast and practical approximation schemes. New methods and techniques are essential in developing such improved…
In this paper we consider the open shop scheduling problem where the jobs have delivery times. The minimization criterion is the maximum lateness of the jobs. This problem is known to be NP-hard, even restricted to only 2 machines. We…
In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
In this paper we study the classical scheduling problem of minimizing the total weighted completion time on a single machine with the constraint that one specific job must be scheduled at a specified position. We give dynamic programs with…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…
We are concerned with the problem of scheduling $n$ jobs onto $m$ identical machines. Each machine has to be in operation for a prescribed time, and the objective is to minimize the total machine working time. Precisely, let $c_i$ be the…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
Parallel machine scheduling has been extensively studied in the past decades, with applications ranging from production planning to job processing in large computing clusters. In this work we study some of these fundamental optimization…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
We consider non-preemptive scheduling problems on parallel identical machines where machines change their status from being available to being unavailable and vice versa along the time horizon. The particular form of unavailability we…
In this paper we consider single machine scheduling problems with additional non-renewable resource constraints. Examples for non-renewable resources include raw materials, energy, or money. Usually they have an initial stock and…
A very well-known machine model in scheduling allows the machines to be unrelated, modelling jobs that might have different characteristics on each machine. Due to its generality, many optimization problems of this form are very difficult…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…