相关论文: AMS02 Ecal gamma trigger performance measured at t…
On December 19, 2002, during the Performance and Verification Phase of INTEGRAL, a Gamma-Ray Burst (GRB) has been detected and localized in real time with the INTEGRAL Burst Alert System (IBAS). Here we present the results obtained with the…
In 2007 a prototype of a new analog Sum-Trigger was installed in the MAGIC I telescope, which lowered the trigger threshold from 55 GeV to 25 GeV and led to the detection of pulsed gamma radiation from the Crab pulsar. To eliminate the need…
Implementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel,…
This study is focused on an investigation of the performance of the Short Strip module developed by the ATLAS Inner Tracker (ITk) strip collaboration using electron beams of energy 5.4 GeV and 5.8 GeV at the DESY-II Testbeam Facility. The…
The HADES first level trigger is studied for the system p+Ni at a beam energy of 2 AGeV. The timing properties of the trigger signal are reported. The efficiency loss due to deadtime is specified. A trigger requirement of a time overlap…
The Advanced ACTPol (AdvACT) upgrade to the Atacama Cosmology Telescope (ACT) features arrays of aluminum manganese transition-edge sensors (TESes) optimized for ground-based observations of the Cosmic Microwave Background (CMB). Array…
An innovative Cylindrical Gas Electron Multiplier (CGEM) detector is under construction for the upgrade of the inner tracker of the BESIII experiment. A novel system has been worked out for the readout of the CGEM detector, including a new…
The transverse-field Ising model serves as a paradigm for studying confinement and excitation spectra, particularly the emergence of $E_8$ symmetry near criticality. However, experimentally resolving the Ising meson spectroscopy required to…
In this paper (Paper II) we complete our discussion on the results of a comprehensive GEANT simulation of the scientific performance of the AGILE Gamma-Ray Imaging Detector (GRID), operating in the 30 MeV - 50 GeV energy range in an…
The vertical plane transverse emittance of accelerated electron bunches at the AWAKE experiment at CERN has been determined, using three different methods of data analysis. This is a proof-of-principle measurement using the existing AWAKE…
The ALICE experiment at the LHC is equipped with an electromagnetic calorimeter (EMCal) designed to enhance its capabilities for jet measurement. In addition, the EMCal enables triggering on high energy jets. Based on the previous…
The AMS-02 experiment will be installed on the International Space Station at an altitude of about 400 km in 2010 to measure for three years cosmic rays. The total acceptance including the electromagnetic calorimeter is 0.095 m$^2$sr. This…
A new TDC chip has been developed for the COMPASS experiment at CERN. The resulting ASIC offers an unprecedented degree of flexibility and functionality. Its capability to handle highest hit and trigger input rates as well as its low power…
The BABAR detector operated successfully at the PEP-II asymmetric e+e- collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems,…
The Electron-Ion Collider (EIC) is a next-generation accelerator primarily designed to study the internal structure of nucleons through high-precision electron-hadron collisions. In this work, we explore the feasibility of employing a 1 MW…
The Cylindrical GEM-Inner Tracker (CGEM-IT) is the upgrade of the internal tracking system of the BESIII experiment. It consists of three layers of cylindrically-shaped triple GEMs, with important innovations with respect to the existing…
It is proposed to upgrade the endcap time-of-flight (ETOF) of the Beijing Spectrometer III (BESIII) with multi-gap resistive plate chamber (MRPC), aiming at overall time resolution about 80 ps. After the entire electronics system is ready,…
The beam test for the SiW-ECAL technological prototype was conducted using electron beam in June-July 2019 at DESY test beam facility in Hamburg, Germany. In the beam test, there were two main programs: MIP program (without tungsten) and…
Triple-GEM detectors for the GE2/1 and ME0 stations of the endcap muon system for the Phase-2 upgrade of the CMS Experiment have been operated in a test beam to measure their efficiency and spatial resolution, together with a high spatial…
An extensive system test of the ATLAS muon spectrometer has been performed in the H8 beam line at the CERN SPS during the last four years. This spectrometer will use pressurized Monitored Drift Tube (MDT) chambers and Cathode Strip Chambers…