相关论文: Financial Risk-Based Scheduling of Microgrids Acco…
By modeling the uncertainty of spinning reserves provided by energy storage with probabilistic constraints, a new optimal scheduling mode is proposed for minimizing the operating costs of an isolated microgrid (MG) by using…
The integration of renewable energy sources in microgrids introduces significant operational challenges due to their intermittent nature and the mismatch between generation and demand patterns. Effective demand response (DR) strategies are…
In this paper, we study distributionally risk-receptive and distributionally robust (or risk-averse) multistage stochastic mixed-integer programs (denoted by DRR- and DRO-MSIPs). We present cutting plane-based and reformulation-based…
This paper explores the critical domain of Revenue Management (RM) within Operations Research (OR), focusing on intricate pricing dynamics. Utilizing Mixed Integer Linear Programming (MILP) models, the study enhances revenue optimization by…
We present a compact mixed integer program (MIP) for the backhaul profit maximization problem in which a freight carrier seeks to generate profit from an empty delivery vehicle's backhaul trip from its last scheduled delivery to its depot…
This work proposes a cooperative trading scheme for the robust optimal energy and reserve management in a multiple-microgrid (MMG) system comprising four microgrids (MGs). This scheme includes a robust optimization (RO) model which accounts…
Decarbonisation is driving dramatic growth in renewable power generation. This increases uncertainty in the load to be served by power plants and makes their efficient scheduling, known as the unit commitment (UC) problem, more difficult.…
In this paper, the optimal operation of a microgrid is investigated when the network is connected at a 24-hour interval for a specific day. For the optimal operation, some criteria, such as the simultaneous reduction in operation costs,…
This paper proposes a novel resilience index, a microgrid survivability rate (SR) under extreme events, and then proposes a novel Resilient Operational Planning (ROP) algorithm to maximize the proposed resilience index SR. The proposed ROP…
In this paper, we explore model-based approach to training robust and interpretable binarized regression models for multiclass classification tasks using Mixed-Integer Programming (MIP). Our MIP model balances the optimization of prediction…
This paper presents a scenario based robust optimization framework for short term energy scheduling in electricity intensive industrial plants, explicitly addressing uncertainty in planning decisions. The model is formulated as a two-stage…
Supply chain (SC) risk management is influenced by both spatial and temporal attributes of different entities (suppliers, retailers, and customers). Each entity has given capacity and lead time for processing and transporting products to…
In order to manage peak-grid events, utilities run incentive-based demand response (DR) programs in which they offer an incentive to assets who promise to curtail power consumption, and impose penalties if they fail to do so. We develop a…
One of the widely used peak reduction methods in smart grids is demand response, where one analyzes the shift in customers' (agents') usage patterns in response to the signal from the distribution company. Often, these signals are in the…
This paper presents how a mixed-integer programming (MIP) formulation for influence diagrams, based on a gradual rooted junction tree representation of the diagram, can be generalized to incorporate risk considerations such as conditional…
The growing penetration of renewable generation in distribution networks, primarily deployed by end-use electricity customers, is changing the traditional load profile and inevitably makes supply-load balancing more challenging for grid…
Conventional stochastic control methods have several limitations. They focus on optimizing the average performance and, in some cases, performance variability; however, their problem settings still require an explicit specification of the…
Integrated with a high share of Inverter-Based Resources (IBRs), microgrids face increasing complexity of frequency dynamics, especially after unintentional islanding from the maingrid. These IBRs, on the other hand, provide more control…
In this study, a cooperative game model is presented to schedule the day-ahead operation of multi-microgrid (MMG) systems. In the proposed model, microgrids are scheduled to achieve a global optimum for the cost of the multi-microgrid…
In this paper, the building thermal dynamic characteristics are introduced in the community microgrid (MG) planning model. The proposed planning model is formulated as a mixed integer linear programming (MILP) which seeks to determine the…