相关论文: The Advanced Light Source Accelerator Control Syst…
The Advanced Light Source (ALS) at Lawrence Berkeley National Laboratory, a third-generation synchrotron light source operational since 1992, is undergoing a comprehensive upgrade of its storage ring RF control system. The legacy Horner PLC…
The Advanced Photon Source (APS) was commissioned in 1995 as a third-generation x-ray user facility. At that time orbit control was performed exclusively with broadband rf beam position monitors (BPMs). Since then, emphasis has been placed…
The Source Development Lab (SDL) at BNL consists of a 230 MeV electron linac and a 10 m long wiggler for short wavelength Free Electronic Laser (FEL) development. The original control system [1] was based on the one in use at the National…
An S-band linear accelerator is the source of particles and the front end of the Advanced Photon Source injector. In addition, it supports a low-energy undulator test line (LEUTL) and drives a free-electron laser (FEL). A…
First Experiences Integrating PC Distributed I/O Into Argonne's ATLAS Control System The roots of ATLAS (Argonne Tandem-Linac Accelerator System) date back to the early 1960s. Located at the Argonne National Laboratory, the accelerator has…
In the next 5 to 10 years, new fourth generation light sources will be coming online either from upgrades or as brand new facilities. The question regarding the competitiveness and the usability of a third generation light source is…
A new system for precise measurements of the field integrals and multipole components of the APS magnetic insertion devices is described. A stretched coil is used to measure magnetic field characteristics. The hardware includes a number of…
As the Advanced CCD Imaging Spectrometer (ACIS) on the Chandra X-ray Observatory enters its fifteenth year of operation on orbit, it continues to perform well and produce spectacular scientific results. The response of ACIS has evolved over…
The S-band linear accelerator, which was built to be the source of particles and the front end of the Advanced Photon Source injector, is now also being used to support a low-energy undulator test line (LEUTL) and to drive a free-electron…
The ATLAS trigger has been used very successfully to collect collision data during 2009 and 2010 LHC running at centre of mass energies of 900 GeV, 2.36 TeV, and 7 TeV. This paper presents the ongoing work to commission the ATLAS trigger…
The Advanced Photon Source (APS) primary and backup injectors consist of two thermionic-cathode rf guns. These guns are being upgraded to provide improved performance, to improve ease of maintenance, and to reduce downtime required for…
We report on recent improvements of the Atacama Pathfinder Experiment Control System (APECS) to cope with the ever increasing data rates and volumes. Also the very wide bandwidths of current instruments required switching to vectorized…
Implementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel,…
The commissioning of the Swiss Light Source (SLS) started in Feb. 2000 with the Linac, continued in May 2000 with the booster synchrotron and by Dec. 2000 first light in the storage ring were produced. The first four beam lines had to be…
After the first successful LHC run in 2010-2012, plans are actively advancing for a series of upgrades leading eventually to about above times the design-luminosity in about ten years. The larger luminosity will allow to perform precise…
As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the original control system. The control system for the KEK electron/positron injector-linac has been using Unix…
The SLAC PES, developed in the early 1990s for the SLC, has been in continuous use since 1992, during which time it has undergone numerous upgrades. The upgrades include improved cathodes with their matching laser systems, modified…
Magnet power supplies in the PSI accelerator complex with their control and field-bus are old. Some components are more then 30 years old. To guarantee further maintenance and to meet the more demanding specifications for operation with the…
Due to the growing awareness of driving safety and the development of sophisticated technologies, advanced driving assistance system (ADAS) has been equipped in more and more vehicles with higher accuracy and lower price. The latest…
Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available and…