相关论文: Upgrade of the Control System of the IFUNAM's Pell…
As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the original control system. The control system for the KEK electron/positron injector-linac has been using Unix…
Implementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel,…
A 70 GeV Proton Synchrotron Extracted Beam Lines Control System is described. About 130 Magnet Dipoles and Quadrupoles, 20 Correction Magnets, 50 Beam Collimators, BPM equipment spread over 1 Km have to be controlled. The old System was…
We describe some of the challenges of particle accelerator control, highlight recent advances in neural network techniques, discuss some promising avenues for incorporating neural networks into particle accelerator control systems, and…
The Intense Pulsed Neutron Source has been an operating user facility for more than 20 years. Development of an upgrade for the data acquisition system has been in progress for some time now. Now that the initial installation on the test…
We report on recent improvements of the Atacama Pathfinder Experiment Control System (APECS) to cope with the ever increasing data rates and volumes. Also the very wide bandwidths of current instruments required switching to vectorized…
At present, a variety of image-based diagnostics are used in particle accelerator systems. Often times, these are viewed by a human operator who then makes appropriate adjustments to the machine. Given recent advances in using convolutional…
The SRS is a 2GeV synchrotron light source with 14 beamlines serving approximately 34 experimental stations. Control of the major elements of the beamlines (vacuum pumps, gauges, valves and radiation stops) is the responsibility of the main…
Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…
The 3 MV Tandem Pelletron accelerator at the Spanish Accelerator Laboratory (CNA) has been recently upgraded to produce pulsed ion beams for neutron Time-Of-Flight (TOF) measurements. The upgrade has consisted of two actions: a pulsing…
Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available and…
The Tevatron in Collider Run II (2001-present) is operating with six times more bunches and many times higher beam intensities and luminosities than in Run I (1992-1995). Beam diagnostics were crucial for the machine start-up and the…
With the new GSI High Current Injector, the beam pulse intensity will be increased by more than two orders of magnitude. The high beam power and the short stopping range at particle energies below 12 MeV/u can destroy accelerator components…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…
We will use EPICS toolkit [1] to build a prototype for upgrading BEPC control system. The purposes are for the following three aspects: (1) Setup a network based distributed control system with EPICS. (2) Study some front-end control…
We integrated an injector linac control system to the SPring-8 standard system on September 2000. As a result of this integration, the SPring-8 accelerator complex was controlled by one unified system. Because the linac was continuously…
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac…
Very compact 70 MeV pulse race-track microtron is under construction now. To acquire outputs of beam-current transformers on every orbit and pulses of high voltage and RF field a distributed multi-channel beam diagnostic system was…
The Integrated Computer Control System (ICCS) for the National Ignition Facility (NIF) is a layered architecture of 300 front-end processors (FEP) coordinated by supervisor subsystems including automatic beam alignment and wavefront…
The machines and beamlines controlled by VME industrial networks are very popular in accelerator faculties. Recently new software technology, among of which are Internet/Intranet application, Java language, and distributed calculating…