English

U-70 Proton Synchrotron Extracted Beam Lines Control System Modernization

High Energy Physics - Phenomenology 2007-05-23 v1

Abstract

A 70 GeV Proton Synchrotron Extracted Beam Lines Control System is described. About 130 Magnet Dipoles and Quadrupoles, 20 Correction Magnets, 50 Beam Collimators, BPM equipment spread over 1 Km have to be controlled. The old System was based on the PDP-11/40 and LSI-11 compatible computers and the MIL 1553 STD as a Field Bus. It successfully operated about 15 years. A new system includes home made Equipment Controllers based on I 8051 Processors, CAN Field Bus, FECs, Servers, Consoles connected by Ethernet. On the first stage of modernization PDPs and LSIs are replaced with PCs connected by Ethernet. Equipment controllers are being successfully tested in the Collimators and Corrector Magnets Controls during a run.

Keywords

Cite

@article{arxiv.hep-ph/0111079,
  title  = {U-70 Proton Synchrotron Extracted Beam Lines Control System Modernization},
  author = {V. Alferov and Y. Bordanovski and S. Klimov and V. Ilukin and V. Kuznetsov and O. Radin and A. Shalunov and A. Sytin and P. Vetrov and V. Yaryguine and V. Zapolsky and V. Zarucheisky},
  journal= {arXiv preprint arXiv:hep-ph/0111079},
  year   = {2007}
}

Comments

3 pages, 2 figures, International Conference on Accelerator and Large Experimental Physics Control Systems San Jose, California, November 27-30, 2001

R2 v1 2026-07-22T13:37:18.880Z