相关论文: Resource-constrained Project Scheduling with Time-…

200 篇论文

Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many…

人工智能 · 计算机科学 2020-10-26 Viktoria A. Hauder , Andreas Beham , Sebastian Raggl , Sophie N. Parragh , Michael Affenzeller

This paper presents a branch-and-bound algorithm, enhanced with bin packing strategies, for scheduling under variable energy pricing and power-saving states. The proposed algorithm addresses the 1,TOU|states|TEC problem, which involves…

最优化与控制 · 数学 2025-07-23 Ondřej Benedikt , István Módos , Antonin Novak , Zdeněk Hanzálek

Energy systems planning models identify least-cost strategies for expansion and operation of energy systems and provide decision support for investment, planning, regulation, and policy. Most are formulated as linear programming (LP) or…

最优化与控制 · 数学 2025-01-08 Anna Jacobson , Filippo Pecci , Nestor Sepulveda , Qingyu Xu , Jesse Jenkins

Resource Constrained Project Scheduling Problems (RCPSPs) without preemption are well-known NP-hard combinatorial optimization problems. A feasible RCPSP solution consists of a time-ordered schedule of jobs with corresponding execution…

We formulate the Resource-Constrained Project Scheduling Problem (RCPSP) as optimal search over the reachability graph of a Timed Transition Petri Net with Resources, using relative-delay tokens so that scheduling decisions correspond to…

人工智能 · 计算机科学 2026-05-18 Ido Lublin , Dor Atzmon , Izack Cohen

The combined increase of energy demand and environmental pollution at a global scale is entailing a rethinking of the production models in sustainable terms. As a consequence, energy suppliers are starting to adopt strategies that flatten…

数据结构与算法 · 计算机科学 2023-05-30 Roberto Ronco

In this paper we deal with a complex real world scheduling problem closely related to the well-known Resource-Constrained Project Scheduling Problem (RCPSP). The problem concerns industrial test laboratories in which a large number of tests…

人工智能 · 计算机科学 2024-11-01 Tobias Geibinger , Florian Mischek , Nysret Musliu

Resource-constrained project scheduling problems (RCPSP) are at the heart of many production planning problems across a plethora of applications. Although the problem has been studied since the early 1960s, most developments and test…

最优化与控制 · 数学 2022-09-07 Rodrigo A. Carrasco , Diego Fuentes , Eduardo Moreno

The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical scheduling problem that has received significant attention due to of its numerous applications in industry. However, in practice, task durations are subject to…

人工智能 · 计算机科学 2025-11-18 Guillaume Infantes , Stéphanie Roussel , Antoine Jacquet , Emmanuel Benazera

Logic-Based Benders Decomposition (LBBD) and its Branch-and-Cut variant, namely Branch-and-Check, enjoy an extensive applicability on a broad variety of problems, including scheduling. Although LBBD offers problem-specific cuts to impose…

最优化与控制 · 数学 2025-04-02 Ioannis Avgerinos , Ioannis Mourtos , Stavros Vatikiotis , Georgios Zois

This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max)). Recent advances in Constraint Programming (CP) and Temporal Networks have reinvoked…

人工智能 · 计算机科学 2025-03-25 Kim van den Houten , Léon Planken , Esteban Freydell , David M. J. Tax , Mathijs de Weerdt

In this work, we consider a scheduling problem faced by production companies with large electricity consumption. Due to the contract with the electric utility, the production companies are obligated to comply with the total energy…

数据结构与算法 · 计算机科学 2018-02-14 István Módos , Přemysl Šůcha , Zdeněk Hanzálek

Given a system model where machines have distinct speeds and power ratings but are otherwise compatible, we consider various problems of scheduling under resource constraints on the system which place the restriction that not all machines…

数据结构与算法 · 计算机科学 2019-02-08 Mohammed Haroon Dupty , Pragati Agrawal , Shrisha Rao

Unit commitment problem on an electricity network consists in choosing the production plan of the plants (units) of a company in order to meet demand constraints. It is generally solved using a decomposition approach where demand…

最优化与控制 · 数学 2018-09-05 Markus Kruber , Axel Parmentier , Pascal Benchimol

This paper develops an exact solution framework for the choice-based time slot management problem under mixed logit demand in attended home delivery systems. The problem jointly optimizes delivery slot offerings, price discounts, and…

最优化与控制 · 数学 2026-05-12 Dorsa Abdolhamidi , Carla Juvin , Virginie Lurkin

Scheduling precedence-constrained tasks under shared renewable resources is central to modern computing platforms. The Resource Investment Problem (RIP) models this setting by minimizing the cost of provisioned renewable resources under…

分布式、并行与集群计算 · 计算机科学 2026-02-09 Yi-Xiang Hu , Yuke Wang , Feng Wu , Zirui Huang , Shuli Zeng , Xiang-Yang Li

This study presents a hybrid metaheuristic for the resource-constrained project scheduling problem (RCPSP), which integrates a genetic algorithm (GA) and a neighborhood search strategy (NS). The RCPSP consists of a set of activities that…

最优化与控制 · 数学 2025-09-15 Evgenii Goncharov

We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…

数据结构与算法 · 计算机科学 2023-10-11 Christoph Damerius , Peter Kling , Florian Schneider

This paper considers heuristics for well known resource-constrained project scheduling problem (RCPSP). First a feasible schedule is constructed using randomized best insertion algorithm. The construction is followed by a local search where…

离散数学 · 计算机科学 2007-05-23 Igor Pesek , Janez Žerovnik

We consider the Continuous Energy-Constrained Scheduling Problem (CECSP). A set of jobs has to be processed on a continuous, shared resource. A schedule for a job consists of a start time, completion time, and a resource consumption…

最优化与控制 · 数学 2024-10-16 Roel Brouwer , Marjan van den Akker , Han Hoogeveen