相关论文: Resource-constrained Project Scheduling with Time-…
Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many…
This paper presents a branch-and-bound algorithm, enhanced with bin packing strategies, for scheduling under variable energy pricing and power-saving states. The proposed algorithm addresses the 1,TOU|states|TEC problem, which involves…
Energy systems planning models identify least-cost strategies for expansion and operation of energy systems and provide decision support for investment, planning, regulation, and policy. Most are formulated as linear programming (LP) or…
Resource Constrained Project Scheduling Problems (RCPSPs) without preemption are well-known NP-hard combinatorial optimization problems. A feasible RCPSP solution consists of a time-ordered schedule of jobs with corresponding execution…
We formulate the Resource-Constrained Project Scheduling Problem (RCPSP) as optimal search over the reachability graph of a Timed Transition Petri Net with Resources, using relative-delay tokens so that scheduling decisions correspond to…
The combined increase of energy demand and environmental pollution at a global scale is entailing a rethinking of the production models in sustainable terms. As a consequence, energy suppliers are starting to adopt strategies that flatten…
In this paper we deal with a complex real world scheduling problem closely related to the well-known Resource-Constrained Project Scheduling Problem (RCPSP). The problem concerns industrial test laboratories in which a large number of tests…
Resource-constrained project scheduling problems (RCPSP) are at the heart of many production planning problems across a plethora of applications. Although the problem has been studied since the early 1960s, most developments and test…
The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical scheduling problem that has received significant attention due to of its numerous applications in industry. However, in practice, task durations are subject to…
Logic-Based Benders Decomposition (LBBD) and its Branch-and-Cut variant, namely Branch-and-Check, enjoy an extensive applicability on a broad variety of problems, including scheduling. Although LBBD offers problem-specific cuts to impose…
This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max)). Recent advances in Constraint Programming (CP) and Temporal Networks have reinvoked…
In this work, we consider a scheduling problem faced by production companies with large electricity consumption. Due to the contract with the electric utility, the production companies are obligated to comply with the total energy…
Given a system model where machines have distinct speeds and power ratings but are otherwise compatible, we consider various problems of scheduling under resource constraints on the system which place the restriction that not all machines…
Unit commitment problem on an electricity network consists in choosing the production plan of the plants (units) of a company in order to meet demand constraints. It is generally solved using a decomposition approach where demand…
This paper develops an exact solution framework for the choice-based time slot management problem under mixed logit demand in attended home delivery systems. The problem jointly optimizes delivery slot offerings, price discounts, and…
Scheduling precedence-constrained tasks under shared renewable resources is central to modern computing platforms. The Resource Investment Problem (RIP) models this setting by minimizing the cost of provisioned renewable resources under…
This study presents a hybrid metaheuristic for the resource-constrained project scheduling problem (RCPSP), which integrates a genetic algorithm (GA) and a neighborhood search strategy (NS). The RCPSP consists of a set of activities that…
We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…
This paper considers heuristics for well known resource-constrained project scheduling problem (RCPSP). First a feasible schedule is constructed using randomized best insertion algorithm. The construction is followed by a local search where…
We consider the Continuous Energy-Constrained Scheduling Problem (CECSP). A set of jobs has to be processed on a continuous, shared resource. A schedule for a job consists of a start time, completion time, and a resource consumption…