相关论文: Recycler Chromaticities and End Shims for NOvA at …
For NOvA and future experiments requiring high intensity proton beams, Fermilab is in the process of upgrading the existing accelerator complex for increased proton production. One such improvement is to reduce the Main Injector cycle time,…
During Nova operations it is planned to run the Fermilab Recycler in a 12 batch slip stacking mode. In preparation for this, measurements of the tune during a six batch injection and then as the beam is slipped by changing the RF frequency,…
For NOvA and future experiments requiring high intensity proton beams, Fermilab is in the process of upgrading the existing accelerator complex for increased proton production. One such improvement is to reduce the Main Injector cycle time,…
The NO{\nu}A Experiment will construct a detector optimized for electron neutrino detection in the existing Neutrino at Main Injector (NuMI) beamline. This beamline is capable of operating at 400 kW of primary beam power and the upgrade…
We develop a configuration of radio-frequency (rf) cavities to dramatically improve the performance of slip-stacking. Slip-stacking is an accumulation technique used at Fermilab to nearly double proton intensity by maintaining two beams of…
We examine the potential impacts to slip-stacking from a change of the Booster cycle-rate from 15- to 20-Hz. We find that changing the Booster cycle-rate to 20-Hz would greatly increase the slip-stacking bucket area, while potentially…
This is an updated version of the NOvA proposal. The detector is a 30 kiloton tracking calorimeter, 15.7 m by 15.7 m by 132 m long, with alternating horizontal and vertical rectangular cells of liquid scintillator contained in PVC extrusion…
Currently a fast vertical 1.08-m long kicker (notcher) located in the Fermilab Booster Long-5 straight section is used to remove 3 out of 84 circulating bunches after injection to generate an abort gap. With magnetic field of 72.5 Gauss it…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
The NuMI Off-Axis v Appearance (NOvA) experiment is a long baseline neutrino oscillation experiment using a neutrino source created from the NuMI Beamline at Fermilab. The experiment will study the oscillations of muon neutrinos to electron…
The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the…
To achieve the true diffraction-limited emittance of a storage ring light source, such as ~10 pm.rad for medium-energy electron beams, within a limited circumference, it is generally necessary to increase the number of bending magnets in a…
The inability to efficiently tune the optical properties of waveguiding structures has been one of the major hurdles for the future scalability of integrated photonic systems. In silicon photonics, although dynamic tuning has been achieved…
NOvA is a long-baseline accelerator-based neutrino oscillation experiment that is optimized for electron-neutrino appearance measurements. It uses the upgraded NuMI beam from Fermilab and consists of a Far Detector in Ash River, Minnesota…
The extraction bucket position in the Fermilab Booster is controlled with a cogging process that involves the comparison of the Booster RF count and the Recycler Ring revolution marker. A one RF bucket jitter in the extraction bucket…
A new beam injection scheme is proposed for the Fermilab Booster to increase beam brightness. The beam is injected on the deceleration part of the sinusoidal magnetic ramp and capture is started immediately after the injection. During the…
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In…
In order to meet the needs of Fermilabs planned post-collider experimental program, the total proton throughput of the 8 GeV Booster accelerator must be nearly doubled within the next two years. A system of 48 ramped corrector magnets has…
A new adaptive weighted essentially non-oscillatory WENO-$\theta$ scheme in the context of finite difference is proposed. Depending on the smoothness of the large stencil used in the reconstruction of the numerical flux, a parameter…
NOvA is a long-baseline neutrino oscillation experiment using Fermilab's 700 kW NuMI muon neutrino beam. Two functionally identical scintillator detectors are placed off the beam axis, separated by 810 km oscillation baseline. Both…