Related papers: PIP-II Transfer Lines Design
In view of a possible evolution of the CERN accelerator complex towards higher proton intensities, a 2.2 GeV H- linac with 4 MW beam power has been designed, for use in connection with an accumulator and compressor ring as proton driver of…
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long…
The Fermi National Accelerator Laboratory (FNAL) Linac has been in operation for 52 years. In approximately four years, it will be replaced by a new 800 MeV superconducting machine, the PIP-II SRF Linac. In the current configuration, the…
The peak current limit for the Fermilab Linac was recently studied. The purpose was to learn what components of the present Linac can be used for the first stage of a proposed proton driver[1]. For this application the Linac must provide a…
The 40-year-old Fermilab Proton Source machines, constituted by the Pre-Injector, Linac and the synchrotron Booster, have been the workhorse of the Fermi National Accelerator Laboratory (Fermilab). During this time, the High Energy Physics…
A 5-MeV RFQ designed for a proton current up to 100-mA CW is now under construction as part of the High Intensity Proton Injector project (IPHI). Its computed transmission is greater than 99 %. The main goals of the project are to verify…
The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the…
Proton beam dumps are prolific sources of mesons enabling a powerful technique to search for vector mediator coupling of dark matter to neutral pion and higher mass meson decays. By the end of the decade the PIP-II linac will be delivering…
Fermilab has been working with the international particle physics and nuclear physics communities to explore and develop research programs possible with a new high intensity proton source known as "Project-X". Project X will provide…
We propose an evolution of the Mu2e experiment, called Mu2e-II, that would leverage advances in detector technology and utilize the increased proton intensity provided by the Fermilab PIP-II upgrade to improve the sensitivity for…
The Proton Improvement Plan-II (PIP-II [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A preproduction SSR2 cryomodule will contain 5 jacketed cavities. Several units are already manufactured and prepared for cold testing.…
The Mu2e experiment at Fermilab is being designed to study the coherent neutrino-less conversion of a negative muon into an electron in the field of a nucleus. This process has an extremely low probability in the Standard Model, and its…
Fermilab is currently constructing a superconducting electron linac that will eventually serve as the backbone of a user-driven facility for accelerator science. This contribution describes the accelerator and summarizes the enabled…
The accelerator for the APT Project is a 100 mA CW proton linac with an output energy of 1030 MeV. A High Energy Beam Transport (HEBT) conveys the beam to a raster expander, that provides a large rectangular distribution at a target/blanket…
In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These include a prototype…
Part-3 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". The proposed Project X proton accelerator at Fermilab, with multi-MW beam power and highly versatile beam formatting, will be a unique world-class…
LINAC 4 is a normal conducting H- structure proposed to intensify the proton flux currently available for the CERN accelerator chain. This linac is designed to accelerate a 65 mA beam up to 160 MeV to be injected into the CERN Proton…
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. First stage of the Project-X consists of superconducting linac which will be operated in continuous wave (CW) mode to accelerate the beam from 2.5 MeV to…
This paper presents the uTCA4.0-based BPM electronics for PIP-II, featuring four 250 MSPS ADCs and a Xilinx UltraScale+ MPSoC FPGA with 10 GbE uplink. Design elements include signal conditioning, clock, and thermal management. The FPGA…
CEA is committed to the design, construction and commissioning of a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons from 1.3 MeV to 35 MeV or…