Related papers: PIP-II Transfer Lines Design
The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a new 800 MeV superconducting linac and a Beam Transfer Line (BTL) to transport the beam to the existing Booster…
The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chopping system to perform arbitrary, bunch-by-bunch…
The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam…
The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the…
Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. The centerpiece of…
The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam…
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT…
Project-X is a proposed project to be built at Fermi National Accelerator Laboratory with several potential missions. A primary part of the Project-X accelerator chain is a Superconducting linac, and In October 2009 a workshop was held to…
Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules.…
The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The…
The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first…
We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton…
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…
The PIP2IT accelerator was assembled in multiple stages in 2014 - 2021 to test concepts and components of the future PIP-II linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA…
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole…
Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In…
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw…
Fermilab has traditionally not been an EPICS house; as such expertise in EPICS is limited and scattered. PIP-II will be using EPICS for its control system. When in operation, it will need to interface with the existing, modernized (see…
The potentially realizable beam power at the Fermilab long-baseline neutrino program has motivated a reinvigorated design and optimization effort for a rapid-cycling synchrotron (RCS) intensity upgrade of the Fermilab proton complex. We…
Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The…