Experience with Long-pulse Operation of the PIP2IT Warm Front End

Accelerator Physics 2019-12-09 v1

Abstract

The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.

Keywords

Cite

@article{arxiv.1912.03180,
  title  = {Experience with Long-pulse Operation of the PIP2IT Warm Front End},
  author = {A. Shemyakin and J. -P. Carneiro and A. Chen and D. Frolov and B. Hanna and R. Neswold and L. Prost and G. Saewert and A. Saini and V. Scarpine and A. Warner and J. -Y. Wu and C. Richard},
  journal= {arXiv preprint arXiv:1912.03180},
  year   = {2019}
}

Comments

4 pages, NAPAC2019