English

Installation, commissioning, and testing of the HB650 CM at PIP2IT

Accelerator Physics 2023-08-23 v1

Abstract

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab's Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

Keywords

Cite

@article{arxiv.2308.11036,
  title  = {Installation, commissioning, and testing of the HB650 CM at PIP2IT},
  author = {M White and J Makara and S Ranpariya and L Pei and M Barba and J Subedi and J Dong and B Hansen and A E T Akintola and J Holzbauer and J Ozelis and S Chandrasekaran and V Roger},
  journal= {arXiv preprint arXiv:2308.11036},
  year   = {2023}
}

Comments

2023 Cryogenic Engineering Conference and International Cryogenic Materials Conference (CEC/ICMC)