English

Performance of PIP-II High-beta 650 Cryomodule After Transatlantic Shipping

Accelerator Physics 2024-09-05 v1

Abstract

After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.

Keywords

Cite

@article{arxiv.2409.02264,
  title  = {Performance of PIP-II High-beta 650 Cryomodule After Transatlantic Shipping},
  author = {J. Ozelis and M. Barba and J. Bernardini and C. Contreras-Martinez and D. Crawford and J. Dong and V. Grzelak and P. Hanlet and J. Holzbauer and Y. Jia and S. Kazakov and T. Khabiboulline and J. Makara and N. Patel and V. Patel and L. Pei and D. Peterson and Y. Pischalnikov and D. Porwisiak and S. Ranpariya and J. Steimel and N. Solyak and J. Subedi and A. Sukhanov and P. Varghese and T. Wallace and M. White and S. Wijethunga and Y. Xie and S. Yoon},
  journal= {arXiv preprint arXiv:2409.02264},
  year   = {2024}
}

Comments

32nd Linear Accelerator Conference (LINAC 2024)