相关论文: Upgrade of the SDL Control System
A SASE FEL facility was first proposed in Feasibility Report of the TAC (Turkish Accelerator Center) project in 2000. Conceptual Design Report (CDR) of the project was completed in 2005. Technical Design Report (TDR) studies of TAC were…
CLIC is a linear $e^+e^-$ ($\gamma\gamma$) collider project which uses a drive beam to accelerate the main beam. The drive beam provides RF power for each corresponding unit of the main linac through energy extracting RF structures. CLIC…
The TAC (Turkish Accelerator Center) IR FEL Oscillator facility, which has been supported by Turkish State Planning Organization (SPO) since 2006, will be based on a 15-40 MeV electron linac accompanying two different undulators with 2.5 cm…
The Spallation Neutron Source (SNS) vacuum instrumentation and control systems are being designed at Lawrence Berkeley National Laboratory (LBNL), Brookhaven National Laboratory (BNL), Thomas Jefferson National Accelerator facility (TJNAF)…
A compact X-ray Free Electron Laser (SwissFEL) is under development at the Paul Scherrer Institute. To increase facility efficiency the main linac will operate in two electron bunch mode. The two bunches are separated in time by 28 ns and…
The Gamma Beam System (GBS) is a high brightness LINAC to be installed in Magurele (Bucharest) at the new ELI-NP (Extreme Light Infrastructure - Nuclear Physics) laboratory. The accelerated electrons, with energies ranging from 280 to 720…
Ultra-high dose rate electron sources require dose rate independent dosimeters and a calibrated dose control system for accurate delivery. In this study, we developed a single-pulse dose monitoring and a real-time dose-based control system…
The Integrated Computer Control System (ICCS) for the National Ignition Facility (NIF) is a layered architecture of 300 front-end processors (FEP) coordinated by supervisor subsystems including automatic beam alignment and wavefront…
The Linac Coherent Light Source (LCLS) at Stanford Linear Accelerator Center (SLAC) is in the process of being upgraded to a superconducting radio frequency (SRF) accelerator and renamed LCLS-II. This upgrade requires thirty five 1.3 GHz…
The ICARUS T600 liquid argon (LAr) time projection chamber (TPC) underwent a major overhaul at CERN in 2016-2017 to prepare for the operation at FNAL in the Short Baseline Neutrino (SBN) program. This included a major upgrade of the…
The Stanford Linear Collider (SLC) was the first prototype of a new type of accelerator, the electron-positron linear collider. Many years of dedicated effort were required to understand the physics of this new technology and to develop the…
The Cornell-BNL FFAG-ERL Test Accelerator (C$\beta$) will comprise the first ever Energy Recovery Linac (ERL) based on a Fixed Field Alternating Gradient (FFAG) lattice. In particular, we plan to use a Non Scaling FFAG (NS-FFAG) lattice…
In the past decade, the fourth-generation light source based on the combination of Energy Recovery Linac (ERL) and Free-Electron Laser (FEL) using superconducting linear accelerators has garnered significant attention. It holds immense…
The Short Baseline Near Detector (SBND) is one of three liquid argon (LAr) neutrino detectors sitting in the Booster Neutrino Beam (BNB) at Fermilab as part of the Short Baseline Neutrino (SBN) program. The detector is in a cryostat holding…
The LHC upgrade is planned to enhance the instantaneous luminosity during Run 3 from 2021 through 2023. The Phase-I upgrade of the trigger readout electronics for the ATLAS Liquid Argon (LAr) Calorimeters will be installed during the second…
The cryogenic system for the Spallation Neutron Source (SNS) is designed by Jefferson Laboratory (JLab) personnel and is based on the existing JLab facility. Our task is to use the JLab control system design [2] as much as practical while…
Dalian Coherent Light Source will use a 300MeV LINAC to produce fully coherent photon pulses in the wavelength range between 150-50nm by high gain harmonic generation free electron laser (FEL) scheme. To generate stable FEL pulses,…
External contractors are developing the local cooling and vacuum control systems for the Spallation Neutron Source (SNS) linac. Soon these systems will be integrated into the facility-wide controls system. Allen-Bradley Logix5000 series…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
The injection control system of Hefei Light Source (HLS) storage ring is a subsystem of the upgraded HLS control system, which is based upon EPICS. Three programmable logic controllers (PLCs) are used as device controllers, which control…