相关论文: The feedback system for the longitudinal coupled-b…
The J-PARC Main Ring (MR) is a high intensity proton synchrotron, which accelerates protons from 3 GeV to 30 GeV. The MR delivers $2.6\times10^{14}$ protons per pulse, which corresponds to the beam power of 500 kW, to the neutrino…
Coupled-bunch instabilities excited by the interaction of the particle beam with its surroundings can seriously limit the performance of circular particle accelerators. These instabilities can be cured by the use of active feedback systems…
In storage-ring-based light sources, harmonic cavities are commonly employed to lengthen the bunch, thereby mitigating collective effects and increasing beam lifetime. While this dual-RF configuration provides important benefits, it also…
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and…
Japan Proton Accelerator Research Complex (J-PARC) aims at a MW-class proton accelerator facility. One of the promising solutions for increasing the beam power of the Main Ring (MR) is converters of the main magnets with new ones for this…
In the framework of the "LHC Injectors Upgrade" (LIU) project, the CERN Proton Synchrotron (PS) is being prepared as a pre-injector for the Large Hadron Collider at high luminosity (HL-LHC). RF systems at 20 MHz, 40 MHz and 80 MHz are…
A problem of coupled-beam instability is solved for two multibunch beams with slightly different revolution frequencies, as in the Fermilab Recycler Ring (RR). Sharing of the inter-bunch growth rates between the intra-bunch modes is…
This paper presents history and evolution of the intra-bunch feedback system for circular accelerators. This pro-ject has been presented by John D. Fox (SLAC/Stanford Un.) at the IPAC2010 held in Kyoto. The idea of the pro-posal is to build…
Intense and well-characterized neutrino sources, coupled with large and high-performance detectors, are essential for elucidating the unknowns in leptonic mixing through neutrino oscillation measurements. The J-PARC accelerator and neutrino…
J-PARC neutrino beamline has been operated since 2009. Until May 2018, the maximum beam power achieved was ~500 kW. In future, the beam power will be upgraded to 1.3 MW. After the stable operation in late 2020s, we can accumulate ~30 x…
The power supply studies for the four-horn system for the CERN to Fr\'ejus neutrino Super Beam oscillation experiment are discussed here. The power supply is being studied to meet the physics potential and the mega-watt (MW) power…
The low level rf (LLRF) control system for the rapid cycling synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) started its operation in 2007. The key functions of the LLRF control system are the dual harmonic auto…
In order to explore CP asymmetry in the lepton sector, a power upgrade to the neutrino experimental facility at J-PARC is a key requirement for both the Tokai to Kamioka (T2K) long-baseline neutrino oscillation experiment and a future…
We report the design, operation and performance of a high-resolution, low-latency, bunch-by-bunch feedback system for nano-beam stabilisation. The system employs novel, ultra-low quality-factor cavity beam position monitors (BPMs), a…
In this paper, some preliminary considerations on the feedback systems for FCC-ee are developed. Bunch-by-bunch feedback systems have been designed in the last years for other e+/e- colliders like PEP-II, KEKB, DAFNE, SuperB and SuperKEKB.…
Upgrade work towards increasing the beam intensity of the neutrino beamline at J- PARC is underway. Monitoring tertiary muon beams is essential for stable operation of the beamline. Accordingly, we plan to replace the present muon monitor…
The J-PARC linac was consist of 324MHz low-{\beta} section and 972MHz high-{\beta} section. There is a total of 48 stations. And each station was equipped with an independent LLRF (Low-Level Radio Frequency) system to realize an…
A high-precision intra-bunch-train beam orbit feedback correction system has been developed and tested in the ATF2 beamline of the Accelerator Test Facility at the High Energy Accelerator Research Organization in Japan. The system uses the…
A high-resolution, intratrain position feedback system has been developed to achieve and maintain collisions at the proposed future electron-positron International Linear Collider (ILC). A prototype has been commissioned and tested with a…
Both horizontal and vertical coherent beam-beam instability are important issues at CEPC. The horizontal instability (X-Z instability) could be induced by beam-beam itself. In this paper we try to study the effect of chromaticity and…