中文
相关论文

相关论文: Achievements and New Challenges for CERN's Digital…

200 篇论文

A new powerful longitudinal diagnostics is being developed for the two CERN's antiproton machines, the Antiproton Decelerator (AD) and the Extra Low ENergy ANtiproton (ELENA) ring. The longitudinal diagnostics receives data from the…

We have commissioned the digital Low Level RF (LLRF) system for storage ring RF at Advanced Light Source at Lawrence Berkeley National Lab (LBNL). The system is composed of 42 synchronous sampling channels for feedback control, diagnostics,…

At the end of the Large Hadron Collider's Run 2, CERN's Proton Injector Linac 2, commissioned in 1978, delivered its final beam in December 2018. For Run 3, from March 2021, a new H$^{-}$ will take over the role: Linac4. The machine has…

加速器物理 · 物理学 2019-10-22 Bartosz Bielawski , Philippe Baudrenghien , Robert Borner

CERN has a longstanding tradition of pursuing fundamental physics on extreme low and high energy scales. The present physics knowledge is successfully described by the Standard Model and the General Relativity. In the anti-matter regime…

加速器物理 · 物理学 2015-06-23 W. Oelert

The first version of digital low level RF (DLLRF) for the Diamond Light Source storage ring and booster was developed with ALBA Synchrotron. Six systems have been built so far. Two of them are in routine operation controlling two normal…

加速器物理 · 物理学 2022-10-10 P Gu , C. Christou , P. Hamadyk , G. B. Christian , D. Spink , A. Tropp

Antiprotons, stored and cooled at low energies in a storage ring or at rest in traps, are highly desirable for the investigation of a large number of basic questions on fundamental interactions. This includes the static structure of…

加速器物理 · 物理学 2016-06-22 Javier Resta-Lopez , James R. Hunt , Carsten P. Welsch

A major LHCb detector upgrade will be installed during long shutdown~4 (LS4) of the CERN Large Hadron Collider. The experiment will operate at a maximum luminosity of up to $1.5\times 10^{34}\mathrm{cm}^{-2}\mathrm{s}^{-1}$, with acceptance…

高能物理 - 实验 · 物理学 2025-04-07 LHCb collaboration

CEA is committed to the design, construction and commissioning of a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons from 1.3 MeV to 35 MeV or…

加速器物理 · 物理学 2019-10-15 L. Zhao , G. Ferrand , F. Gougnaud , R. Duperrier , N. Pichoff , C. Marchand

Incremental upgrades of the legacy low level RF (LLRF) equipment-50 years for the Los Alamos Neutron Science Center (LANSCE)-involves challenges and problems not seen with new and total replacement opportunities. The digital LLRF upgrade at…

加速器物理 · 物理学 2022-10-31 P. Van Rooy , M. Prokop , S. Kwon , P. Torrez , L. Castellano , A. Archuleta , C. Marchwinski

The LCLS began operations in 2009, utilizing SLAC's normal-conducting (NC) LINAC, which features control equipment dating back to the 1960s and 1980s. The Linac Electronics Modernization Plan (LEMP) aims to replace the legacy control…

In the framework of the LHC Injectors Upgrade project, the CERN Proton Synchrotron underwent hardware changes during the Long Shutdown 2. These changes required an update of the CERN Proton Synchrotron impedance model and an assessment of…

加速器物理 · 物理学 2025-05-15 Sébastien Joly , Mauro Migliorati , Nicolas Mounet , Benoît Salvant

The Anti-Matter Factory at CERN is gearing up, commissioning of the Extra Low ENergy Antiprotons (ELENA) ring is ongoing and the first anti-protons are foreseen to circulate in the decelerator very soon. The unprecedented flux of low energy…

原子物理 · 物理学 2017-10-06 P. Crivelli , N. Kolachevsky

High precision Low-level RF (LLRF) control and monitoring systems for future particle accelerators will be a significant technical challenge as the requirements in performance, flexibility and affordability become increasingly stringent. We…

The upcoming operation of the Extra Low ENergy Antiprotons (ELENA) ring at CERN, the upgrade of the anti-proton decelerator (AD), and the installation in the AD hall of an intense slow positron beam with an expected flux of $10^{8}$ e$^+$/s…

原子物理 · 物理学 2016-09-21 P. Crivelli , D. Cooke , M. W. Heiss

The PEP-II B Factory Low-Level RF System (LLRF) is a fully programmable VXI based design running under an EPICS control environment. Several RF feedback loops are used to control longitudinal coupled-bunch modes driven by the accelerating…

加速器物理 · 物理学 2007-05-23 P. Corredoura , S. Allison , W. Ross , R. Sass , R. Tighe

Currently ALS is undergoing an upgrade to ALSU to produce 100 times brighter soft X-ray light. The LLRF system for Accumulator Ring (AR) is composed of two identical LLRF stations, for driving RF amplifiers. The closed loop RF amplitude and…

In the framework of the "LHC Injectors Upgrade" (LIU) project, the CERN Proton Synchrotron (PS) is being prepared as a pre-injector for the Large Hadron Collider at high luminosity (HL-LHC). RF systems at 20 MHz, 40 MHz and 80 MHz are…

加速器物理 · 物理学 2019-10-16 Florian Bertin , Ylenia Brischetto , Heiko Damerau , Azeddine Jibar , Damien Perrelet

Precisely determining the gap voltage and phase in an RF cavity is essential for the calibration of the LLRF feedbacks. Following the conventional approach, measured RF power is converted into gap voltage, assuming a given shunt impedance.…

加速器物理 · 物理学 2023-10-27 Danilo Quartullo , Simon Albright , Heiko Damerau , Giulia Papotti

A second major LHCb detector upgrade will be installed during long shutdown 4 (LS4) of the CERN Large Hadron Collider. The new detector will provide excellent performance for studies of Quantum Chromodynamics at high temperature and…

高能物理 - 实验 · 物理学 2025-04-01 LHCb collaboration

A new beam dump has been designed, built, installed and operated to withstand the future proton beam extracted from the Proton Synchrotron Booster (PSB) in the framework of the LHC Injector Upgrade (LIU) Project at CERN, consisting of up to…

‹ 上一页 1 2 3 10 下一页 ›