相关论文: Sieving out Unnecessary Constraints in Scenario Op…
The optimization of power systems involves complex uncertainties, such as technological progress, political context, geopolitical constraints. Negotiations at COP21 are complicated by the huge number of scenarios that various people want to…
Outage scheduling aims at defining, over a horizon of several months to years, when different components needing maintenance should be taken out of operation. Its objective is to minimize operation-cost expectation while satisfying…
Scenario-Based Programming is a methodology for modeling and constructing complex reactive systems from simple, stand-alone building blocks, called scenarios. These scenarios are designed to model different traits of the system, and can be…
Systematic design and verification of advanced control strategies for complex systems under uncertainty largely remains an open problem. Despite the promise of blackbox optimization methods for automated controller tuning, they generally…
E-powertrain of future electric vehicles could consist of energy generation units (e.g., fuel cells and photovoltaic modules), energy storage systems (e.g., batteries and supercapacitors), energy conversion units (e.g., bidirectional DC/DC…
When dealing with real-world optimization problems, decision-makers usually face high levels of uncertainty associated with partial information, unknown parameters, or complex relationships between these and the problem decision variables.…
Stochastic optimization problems often involve the expectation in its objective. When risk is incorporated in the problem description as well, then risk measures have to be involved in addition to quantify the acceptable risk, often in the…
The optimal control problem of stochastic systems is commonly solved via robust or scenario-based optimization methods, which are both challenging to scale to long optimization horizons. We cast the optimal control problem of a stochastic…
Choosing decision variables deterministically (deterministic decision-making) can be regarded as a particular case of choosing decision variables probabilistically (probabilistic decision-making). It is necessary to investigate whether…
Off-grid microgrids powered entirely by renewable energy sources face substantial challenges in achieving utility-grade reliability standards. Existing microgrid planning frameworks often prioritize cost minimization while treating…
We consider parametric Markov decision processes (pMDPs) that are augmented with unknown probability distributions over parameter values. The problem is to compute the probability to satisfy a temporal logic specification with any concrete…
Optimization of expensive computer models with the help of Gaussian process emulators in now commonplace. However, when several (competing) objectives are considered, choosing an appropriate sampling strategy remains an open question. We…
In some optimal control problems, complex relationships between states and inputs cannot be easily represented using continuous constraints, necessitating the use of discrete logic instead. This paper presents a method for incorporating…
In this paper, we present approximation algorithms for combinatorial optimization problems under probabilistic constraints. Specifically, we focus on stochastic variants of two important combinatorial optimization problems: the k-center…
Performance of optimization on quadratic problems sensitively depends on the low-lying part of the spectrum. For large (effectively infinite-dimensional) problems, this part of the spectrum can often be naturally represented or approximated…
Optimization models have been broadly used within side the energy industry as useful decision-making systems for scheduling and dispatching electric powered energy resources; this is applied in a system called unit commitment (UC). Unit…
The efficacy of robust optimization spans a variety of settings with uncertainties bounded in predetermined sets. In many applications, uncertainties are affected by decisions and cannot be modeled with current frameworks. This paper takes…
We study the feasibility and noise sensitivity of portfolio optimization under some downside risk measures (Value-at-Risk, Expected Shortfall, and semivariance) when they are estimated by fitting a parametric distribution on a finite sample…
We address the problem of portfolio optimization under the simplest coherent risk measure, i.e. the expected shortfall. As it is well known, one can map this problem into a linear programming setting. For some values of the external…
In this paper, we propose an analytical framework to quantify the amount of data samples needed to obtain accurate state estimation in a power system - a problem known as sample complexity analysis in computer science. Motivated by the…