相关论文: Implement and commissioning of the beam energy fee…
This paper describes beam energy online measurement of BEPCII linac, presents the calculation formula and some of the results. The method mentioned here measures the beam energy by acquiring beam positions in the horizontal direction with…
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and…
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam…
The beam energy measurement system is of great importance and profit for both BEPC-II accelerator and BES-III detector. The system is based on measuring the energies of Compton back-scattered photons. Many advanced techniques and precise…
Implementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel,…
We first introduce the design parameters of the Beijing Electron-Positron Collider II (BEPCII) and the simulation study of beam-beam effects during the design process of the machine. The main advances since 2007 are briefly introduced and…
Injected beam energy and energy spread are critical parameters affecting the performance of our rapid cycling synchrotron (RCS). A real-time energy monitoring system is being installed to examine the H- beam out of the Intense Pulsed…
As compared to electron storage rings, one advantage of recirculating linear accelerators is that the beam properties at target are no longer dominated by the equilibrium between quantum radiative diffusion and radiation damping because new…
Recently the Chinese Academy of Sciences has chosen BEPCII as the future development of the BEPC, i.e. upgrade of both the machine and detector. The luminosity of the machine is expected to increase to 1.0x1033cm-2s-1. The project will be…
The energy of a bunched non-relativistic ion beam can be deduced from measuring the beam phases in neighbouring Beam Position Monitors (BPMs). This report discusses implementation of such a procedure at the PIP-II H- linac being constructed…
Recirculating energy recovery linacs are a promising technology for delivering high power particle beams ($\sim$GW) while only requiring low power ($\sim$kW) RF sources. This is achieved by decelerating the used bunches and using the energy…
The High Energy Photon Source (HEPS), is the first fourth-generation storage ring light source being built in the suburb of Beijing, China. The storage ring was designed with the emittance lower than 60 pm.rad with a circumference of 1.36…
The China spallation neutron source (CSNS) linac is designed with beam energy of 81MeV and a peak current of 15mA in the first phase. The RF power system for the 81 MeV Linac requires 8 units of RF power sources, each unit has one…
The new method to stabilize the beam energy of the KEK 40MeV proton linac, is developed now. In this method, the signal of the velocity monitor installed upstream the debuncher in the 40MeV beam line, is processed and then fed to the phase…
This report describes a concept of an EIC cooling system, based on a proven induction linac technology with a dc electron beam. The system would operate in a full energy range of proton beams (100 - 270 GeV) and would provide 50-100 A…
Extensive beam-based feedback systems are planned as an integral part of the Next Linear Collider (NLC) control system. Wakefield effects are a significant influence on the feedback design, imposing both architectural and algorithmic…
Beam injections to KEKB and Photon Factory are performed with pulse-to-pulse modulation at 50 Hz. Three very different beams are switched every 20 ms in order to inject those beams into KEKB HER, LER and Photon Factory (PF) simultaneously.…
Precision beam polarization measurements based on Compton polarimeters are essential for the physics program of future high-energy colliders. In order to prepare for these and to extend the scope of physics measurements of the BESIII…
Suppression of beam losses is essential for successful operation of high-intensity linac. Historically, the values of the field amplitudes and phases of the side-coupled, 805-MHz LANSCE linac modules are maintained using a well-known…
We report the development and implementation of an energy feedback system for the MIT/Bates Linear Accelerator Center. General requirements of the system are described, as are the specific requirements, features, and components of the…