相关论文: Experimental results of the laserwire emittance sc…
A non-invasive, compact laserwire system has been developed to measure the transverse emittance of an H- beam and has been demonstrated at the new LINAC4 injector for the LHC at CERN. Light from a low power, pulsed laser source is conveyed…
The caesiated surface negative ion source is the first element of CERN's LINAC4 a linear injector designed to accelerate negative hydrogen ions to 160 MeV. The IS03 ion source is operated at 35 mA beam intensity and reliably feeds CERN's…
The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H- ions to 800 MeV kinetic energy before injection…
The Linear Accelerator 4 (LINAC 4) is designed to accelerate negative hydrogen ions to high energies for injection into the Large Hadron Collider (LHC), where it has been supplying proton beams since 2020. LINAC 4 accelerates negative…
LINAC 4 is a normal conducting H- structure proposed to intensify the proton flux currently available for the CERN accelerator chain. This linac is designed to accelerate a 65 mA beam up to 160 MeV to be injected into the CERN Proton…
LINAC 4 is a normal conducting H- linac proposed at CERN to provide a higher proton flux to the CERN accelerator chain. It should replace the existing LINAC 2 as injector to the Proton Synchrotron Booster and can also operate in the future…
The Fermilab Side-Coupled Linac accelerates H-beam from 116 MeV to 400 MeV through seven 805 MHz modules. Twelve wire scanners are present in the Side Coupled Linac and four are present in the transfer line between the Linac and the Booster…
Proposed fourth generation light sources using SASE FELs to generate short pulse, coherent, X-rays require demonstration of high brightness electron sources. The Gun Test Facility (GTF) at SLAC was built to test high brightness sources for…
LHC upgrades are being considered both towards higher luminosity (HL-LHC) and towards higher energy (HE-LHC). In this paper we report initial studies of the beam-beam effects in the HE-LHC [1]. The HE-LHC aims at beam energies of 16.5 TeV,…
At the end of the Large Hadron Collider's Run 2, CERN's Proton Injector Linac 2, commissioned in 1978, delivered its final beam in December 2018. For Run 3, from March 2021, a new H$^{-}$ will take over the role: Linac4. The machine has…
During the long shutdown (LS) 3 beginning 2022 the LHC will be upgraded for higher luminosities pushing the limits especially for the inner tracking detectors of the LHC experiments. In order to cope with the increased particle rate and…
The new 1.4 MeV/u front end HSI (HochStromInjektor) of the Unilac accelerates ions with A/q ratios of up to 65 and with beam intensities in emA of up to 0.25 A/q. The maximum beam pulse power is up to 1300 kW. During the stepwise linac…
The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam…
The use of existing linacs, and in particular light source injectors, for free-electron laser (FEL) experiments is becoming more common due to the desire to test FELs at ever shorter wavelengths. The high-brightness, high-current beams…
The Heating Neutral Beam Injectors (HNBs) for ITER will have to deliver 16.7 MW beams of H/D particles at 1 MeV energy. The beams will be produced from H-/D- ions, generated by a radiofrequency plasma source coupled to an ion acceleration…
Crossing a horizontal nonlinear resonance is the approach that can be used to split a beam in several beamlets with the goal to perform multi-turn extraction from a circular particle accelerator. Such an approach has been successfully…
This paper presents one of the case studies of the Gamma Factory initiative -- a proposal of a new operation scheme of ion beams in the CERN accelerator complex. Its goal is to extend the scope and precision of the LHC-based research by…
In view of the high luminosity phase of the LHC (HL-LHC) to start operation around 2026, a major upgrade of the tracker system for the ATLAS experiment is in preparation. The expected neutron equivalent fluence of up to 2.4 * 1e16 1 MeV…
"LUE200" - 200 MeV electron linac is being created at JINR as a driver of the pulsed neutron source "IREN" [1]. The special full-scale facilities for testing the main systems of LUE-200 (FSTF) are used at JINR, BINP, MEPhI and YerPhI [2].…
For the characterization of the 10 mA ion beam delivered by the new High Current Linac at GSI, sophisticated, mainly non-intersepting diagnostic devices were developed. Besides the general set-up of a versatile test bench, we discuss in…