中文
相关论文

相关论文: Momentum Cogging at the Fermilab Booster

200 篇论文

The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main…

加速器物理 · 物理学 2015-02-03 K. Seiya , S. Chaurize , C. Drennan , W. Pellico , A. K. Triplett , A. Waller

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…

加速器物理 · 物理学 2013-01-31 K. Seiya , J. Lackey , W. Marsh , W. Pellico , D. Still , K. Triplet , A. Waller

The Fermilab Booster is being upgraded under the Proton Improvement Plan (PIP) to be capable of providing a proton flux of $2.25^{17}$ protons per hour. The intensity per cycle will remain at the present operational $4.3^{12}$ protons per…

加速器物理 · 物理学 2015-11-05 K. Seiya , C. M. Bhat , D. E. Johnson , V. V. Kapin , W. A. Pellico , C. Y. Tan , R. J. Tesarek

Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This…

The extraction bucket position in the Fermilab Booster is controlled with a cogging process that involves the comparison of the Booster RF count and the Recycler Ring revolution marker. A one RF bucket jitter in the extraction bucket…

加速器物理 · 物理学 2017-09-22 K. Seiya , C. Drennan , W. Pellico , S. Chaurize

Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the…

加速器物理 · 物理学 2017-04-27 C. M. Bhat

A new beam injection scheme is proposed for the Fermilab Booster to increase beam brightness. The beam is injected on the deceleration part of the sinusoidal magnetic ramp and capture is started immediately after the injection. During the…

加速器物理 · 物理学 2015-04-28 C. M. Bhat

The Fermilab Proton Source machines, constituted by Pre-Injector, conventional Linac and Booster synchrotron, at Fermi National Accelerator Laboratory (Fermilab) had have a long history of successful beam operations. Built in late '60s, the…

加速器物理 · 物理学 2014-09-01 F. G. Garcia , W. Pellico

To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6…

加速器物理 · 物理学 2007-05-23 R. Zwaska , S. Kopp , W. Pellico , R. Webber

Currently a fast vertical 1.08-m long kicker (notcher) located in the Fermilab Booster Long-5 straight section is used to remove 3 out of 84 circulating bunches after injection to generate an abort gap. With magnetic field of 72.5 Gauss it…

加速器物理 · 物理学 2013-01-24 I. L. Rakhno , A. I. Drozhdin , N. V. Mokhov , V. I. Sidorov , I. S. Tropin

Currently, Fermilab Booster accelerates ~4.5E12 protons per pulse (ppp) in 81 bunches from 400 MeV to 8 GeV at 15 Hz to provide beam to multiple HEP experiments and is being upgraded to handle higher beam intensity >6.7E12 ppp at a…

加速器物理 · 物理学 2021-10-20 C. M. Bhat , N. Eddy

In order to meet the needs of Fermilabs planned post-collider experimental program, the total proton throughput of the 8 GeV Booster accelerator must be nearly doubled within the next two years. A system of 48 ramped corrector magnets has…

加速器物理 · 物理学 2012-03-09 M. McAteer , S. Kopp , E. Prebys

The Fermilab Booster uses multi-turn beam injection with all its cavities phased such that beam sees a net zero RF voltage even when each station is at the same maxi-mum voltage. During beam capture the RF voltage is increased slowly by…

The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…

加速器物理 · 物理学 2024-06-03 J. -F. Ostiguy , C. M. Bhat

Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…

加速器物理 · 物理学 2015-10-29 C. M. Bhat

Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…

加速器物理 · 物理学 2017-05-04 C. M. Bhat

For Project X, it is planned to inject a beam of 3 10**11 particles per bunch into the Main Injector. To prepare for this by studying the effects of higher intensity bunches in the Main Injector it is necessary to perform coalescing at 8…

加速器物理 · 物理学 2013-02-01 D. J. Scott , D. Capista , B. Chase , J. Dye , I. Kourbanis , K. Seiya , M. -J. Yang

Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton…

Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments.…

加速器物理 · 物理学 2017-05-15 Vladimir Shiltsev

The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam…

加速器物理 · 物理学 2022-02-15 Sergei Nagaitsev , Valeri Lebedev
‹ 上一页 1 2 3 10 下一页 ›