相关论文: Improving the Fermilab Booster Notching Efficiency…
Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…
For Project X, it is planned to inject a beam of 3x10**11 particles per bunch into the Main Injector. Therefore, at 8-GeV, there will be increased space charge tune shifts and an increased incoherent tune spread. In preparation for these…
Currently, Fermilab Booster accelerates ~4.5E12 protons per pulse (ppp) in 81 bunches from 400 MeV to 8 GeV at 15 Hz to provide beam to multiple HEP experiments and is being upgraded to handle higher beam intensity >6.7E12 ppp at a…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…
The current design of beam preparation for a proposed mu->e conversion experiment at Fermilab is based on slow resonant extraction of protons from the Debuncher. The Debuncher ring will have to operate with beam intensities of 3 x 10**12…
For Project X, it is planned to inject a beam of 3 10**11 particles per bunch into the Main Injector. To prepare for this by studying the effects of higher intensity bunches in the Main Injector it is necessary to perform coalescing at 8…
A new Higher Order Mode (HOM) damper was designed and tested for the Booster accelerator cavity at Fermilab. In anticipation of the PIP-II upgrade, it was discovered that the higher beam intensity of PIP-II may cause beam instability due to…
The difference between the rf voltage seen by the beam and the accelerating voltage required to match the rate of change of the Booster magnetic field is used to estimate the energy loss per beam turn. Because the rf voltage (RFSUM) and the…
The Fermilab Proton Source machines, constituted by Pre-Injector, conventional Linac and Booster synchrotron, at Fermi National Accelerator Laboratory (Fermilab) had have a long history of successful beam operations. Built in late '60s, the…
A technique using RF bucket reduction for acquiring information about the particle distribution in longitudinal phase space has been applied in the Fermilab Booster. Data sets were obtained at six important time intervals of a Booster cycle…
Increasing proton beam power on neutrino production targets is one of the major goals of the Fermilab long term accelerator programs. In this effort, the Fermilab 8 GeV Booster synchrotron plays a critical role for at least the next two…
For NOvA and future experiments requiring high intensity proton beams, Fermilab is in the process of upgrading the existing accelerator complex for increased proton production. One such improvement is to reduce the Main Injector cycle time,…
Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
The Fermi National Accelerator Laboratory (Fermilab) Linac accepts 750 keV H- ions from the front end and accelerates them to 400 MeV for injection into the Booster rapid cycling synchrotron. Day-to-day drifts in the beam longitudinal…
A second harmonic RF cavity which uses perpendicularly biased garnet for frequency tuning is currently being constructed for use in the Fermilab Booster. The cavity will operate at twice the fundamental RF frequency, from ~76 - 106 MHz, and…
In era of NOvA operation, it is planned to slip-stack six on six Booster proton batches in the Recycler ring for a total intensity of 5 1013 protons/cycle. During the slip-stacking, the chromaticities are required to be jumped from (-2,-2)…
We have conducted tests at the Fermilab Booster of ionization chambers to be used as monitors of the NuMI neutrino beamline. The chambers were exposed to proton fluxes of up to 10$^{12}$ particles/cm$^2$/1.56$\mu$s. We studied space charge…
The high energy beam transport (HEBT) line for the ISAC radioactive beam facility at TRIUMF requires an 11.8 MHz buncher. The main requirements of the buncher are to operate in cw mode with a velocity acceptance of 2.2% and an effective…
With electron beam durations down to femtoseconds and sub-femtoseconds achievable in current state-of-the-art accelerators, longitudinal bunch length diagnostics with resolution at the attosecond level are required. In this paper, we…