中文
相关论文

相关论文: Measurement and manipulation of beta functions in …

200 篇论文

Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This…

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…

加速器物理 · 物理学 2013-01-31 K. Seiya , J. Lackey , W. Marsh , W. Pellico , D. Still , K. Triplet , A. Waller

Increasing proton beam power on neutrino production targets is one of the major goals of the Fermilab long term accelerator programs. In this effort, the Fermilab 8 GeV Booster synchrotron plays a critical role for at least the next two…

加速器物理 · 物理学 2017-10-23 C. M. Bhat , S. Bhat

The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main…

加速器物理 · 物理学 2015-02-03 K. Seiya , S. Chaurize , C. Drennan , W. Pellico , A. K. Triplett , A. Waller

An overview is given of the methods and preliminary results from dedicated beam studies on three topics conducted over five days in July 2023. In the first study, the Fermilab Booster magnets were held constant at magnetic fields…

加速器物理 · 物理学 2024-08-20 Jeffrey Eldred , Michael Balcewicz , Frank Schmidt , Benjamin Simons

The Fermilab Booster is being upgraded under the Proton Improvement Plan (PIP) to be capable of providing a proton flux of $2.25^{17}$ protons per hour. The intensity per cycle will remain at the present operational $4.3^{12}$ protons per…

加速器物理 · 物理学 2015-11-05 K. Seiya , C. M. Bhat , D. E. Johnson , V. V. Kapin , W. A. Pellico , C. Y. Tan , R. J. Tesarek

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…

加速器物理 · 物理学 2013-01-31 K. Seiya , C. Drennan , W. A. Pellico , K. Triplett , A. Waller

Detrimental beam dynamics effects limit performance of high intensity rapid cycling synchrotrons (RCS) such as the 8 GeV proton Fermilab Booster. Here we report the results of comprehensive experimental studies of various beam intensity…

加速器物理 · 物理学 2021-04-14 Jeff Eldred , Valeri Lebedev , Kiyomi Seiya , Vladimir Shiltsev

The Fermilab Booster is a fast ramping (15Hz) synchrotron which accelerates protons from 400MeV to 8GeV. During commissioning of a transverse digital damper system, it was shown that the damper could provide a measurement of the machine…

加速器物理 · 物理学 2012-09-20 N. Eddy , O. Lysenko

A new beam injection scheme is proposed for the Fermilab Booster to increase beam brightness. The beam is injected on the deceleration part of the sinusoidal magnetic ramp and capture is started immediately after the injection. During the…

加速器物理 · 物理学 2015-04-28 C. M. Bhat

To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6…

加速器物理 · 物理学 2007-05-23 R. Zwaska , S. Kopp , W. Pellico , R. Webber

The Booster Operation Optimization Sequential Time-series for Regression (BOOSTR) dataset was created to provide a cycle-by-cycle time series of readings and settings from instruments and controllable devices of the Booster, Fermilab's…

加速器物理 · 物理学 2021-04-16 Diana Kafkes , Jason St. John

Currently a fast vertical 1.08-m long kicker (notcher) located in the Fermilab Booster Long-5 straight section is used to remove 3 out of 84 circulating bunches after injection to generate an abort gap. With magnetic field of 72.5 Gauss it…

加速器物理 · 物理学 2013-01-24 I. L. Rakhno , A. I. Drozhdin , N. V. Mokhov , V. I. Sidorov , I. S. Tropin

Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…

加速器物理 · 物理学 2017-05-04 C. M. Bhat

From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with improved diagnostics allowed the system to reach sustained…

加速器物理 · 物理学 2013-02-01 Bruce C. Brown

The Fermilab Proton Source machines, constituted by Pre-Injector, conventional Linac and Booster synchrotron, at Fermi National Accelerator Laboratory (Fermilab) had have a long history of successful beam operations. Built in late '60s, the…

加速器物理 · 物理学 2014-09-01 F. G. Garcia , W. Pellico

For the PIP-II program, transverse emittance in the Fermilab Booster must remain well controlled at higher bunch intensities. 4-plate beam position monitors (BPMs) have a small but measurable quadrupole moment, making it possible to infer…

加速器物理 · 物理学 2025-11-26 M. A. Balcewicz , C. Y. Tan

The difference between the rf voltage seen by the beam and the accelerating voltage required to match the rate of change of the Booster magnetic field is used to estimate the energy loss per beam turn. Because the rf voltage (RFSUM) and the…

加速器物理 · 物理学 2007-05-23 Xi Yang , C. Ankenbrandt , J. Norem

Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments.…

加速器物理 · 物理学 2017-05-15 Vladimir Shiltsev

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In…

‹ 上一页 1 2 3 10 下一页 ›