English

PIP-II Injector Test Warm Front End: Commissioning Update

Accelerator Physics 2018-06-18 v1

Abstract

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.

Keywords

Cite

@article{arxiv.1806.05708,
  title  = {PIP-II Injector Test Warm Front End: Commissioning Update},
  author = {L. Prost and R. Andrews and C. Baffes and J. -P. Carneiro and B. Chase and A. Chen and E. Cullerton and P. F. Derwent and J. P. Edelen and J. Einstein-Curtis and D. Frolov and B. Hanna and D. Peterson and G. Saewert and A. Saini and V. Scarpine and A. Shemyakin and J. Steimel and D. Sun and A. Warner and C. Richard and V. L. S. Sista},
  journal= {arXiv preprint arXiv:1806.05708},
  year   = {2018}
}

Comments

4 pp

R2 v1 2026-06-23T02:30:35.951Z