Related papers: Fermilab PIP-II CDS and CM Cryogenic Controls Syst…
CEA Irfu Saclay is involved as partner in the ESS accelerator construction through different work-packages: controls for several RF test stands, for cryomodule demonstrators, for the RFQ coupler test and for the conditioning around 120…
Fermilab is developing a compact superconducting CSRF accelerator as a source of a high-power, high-energy electron beam to produce an x-ray beam comparable to $\geq$ 2 MCi of cobalt-60. As part of this development, we are presently…
At the end of its operations in 2011, the Fermilab antiproton production complex consisted of a sophisticated target system, three 8-GeV storage rings (namely the Debuncher, the Accumulator and the Recycler), 25 independent multi-GHz…
Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous…
The PIP-II project at Fermilab, which includes an 800-MeV superconducting LINAC, demands rigorous radiation shielding optimization to meet safety requirements. We updated the MARS geometry model to reflect new magnet and collimator designs…
Implementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel,…
Fermi National Accelerator Laboratory is constructing a superconducting 1.3 GHz cryomodule test facility located at the New Muon Lab building. The facility will be used for testing and validating cryomodule designs as well as support…
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come.…
The current Timing System at Fermilab has been around for 40 years and currently relies on 7 CAMAC crates and over 100 CAMAC cards to produce the Tevatron Clock (TCLK). Thanks to the ingenuity of those before us, this has allowed Fermilab…
PIP-II is an essential upgrade of the Fermilab complex that will enable the worlds most intense high-energy beam of neutrinos for the international Deep Underground Neutrino Experiment at LBNF and support a broad physics program at…
Fermilab's Integrable Optics Test Accelerator is an electron storage ring designed for testing advanced accelerator physics concepts, including implementation of nonlinear integrable beam optics and experiments on optical stochastic…
We will use EPICS toolkit [1] to build a prototype for upgrading BEPC control system. The purposes are for the following three aspects: (1) Setup a network based distributed control system with EPICS. (2) Study some front-end control…
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised…
Commissioning and operation of the first Tesla-style Cryomodule (CM-1) at Fermilab was concluded in recent months. A second Tesla Type III+ module, RFCA002, will be replacing it. CM-1 is the first 8-cavity ILC style cryomodule to be built…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
The PIP-II linac Cryogenic Distribution System (CDS) is characterized by extremely small heat inflows and robust mechanical design. It consists of a Distribution Valve Box (DVB), Intermediate Transfer Line, Tunnel Transfer Line, comprising…
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to…
The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test…
CEA IRFU Saclay is taking part of ESS (European Spallation Source) construction through several packages and, especially in the last three years on the Elliptical Cavity and Cryomodule Test stand Demonstrator (ECCTD). The project consists…
In the pursuit of quantum computing, solid-state quantum systems, particularly superconducting ones, have made remarkable advancements over the past two decades. However, achieving fault-tolerant quantum computing for next-generation…