Related papers: Fermilab PIP-II CDS and CM Cryogenic Controls Syst…
The U.S. Particle Physics Project Prioritization Panel (P5) report encouraged the realization of Fermilab's Proton Improvement Plan II (PIP-II) to support future neutrino programs in the United States. PIP-II aims at enhancing the…
This contribution reports the design of the production Single Spoke Resonator Type 1 Cryomodule (SSR1 CM) for the PIP-II project at Fermilab. The innovative design is based on a structure, the strongback, which supports the coldmass from…
SPIRAL2 is a superconducting accelerator for protons, deuterons and heavy ions delivering a maximum beam power of 200 kW at 40 MeV (for deuteron beams). 26 superconducting quarter wave cavities are operated at 4.4 K, plunged in a liquid…
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such…
CERN is now setting up String 2, a full-size prototype of a regular cell of the LHC arc. It is composed of two quadrupole, six dipole magnets, and a separate cryogenic distribution line (QRL) for the supply and recovery of the cryogen. An…
Operation of complex systems which depend on one, or more, sub-systems with many process variables often operate in more than one state. For each state there may be a variety of parameters of interest, and for each of these, one may require…
The Linac Coherent Light Source (LCLS) at Stanford Linear Accelerator Center (SLAC) is in the process of being upgraded to a superconducting radio frequency (SRF) accelerator and renamed LCLS-II. This upgrade requires thirty five 1.3 GHz…
As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and…
This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice…
The Horizontal Test Stand (HTS) SRF Cavity and Cryomodule 1 (CM1) of eight 9-cell, 1.3GHz SRF cavities are operating at Fermilab. For the cryogenic control system, how to hold liquid level constant in the cryostat by regulation of its…
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT…
In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These include a prototype…
The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as…
A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and…
In Fermilab's PIP-II machine protection system, beam loss signals from various detectors are digitized at 125 MS/s. Noise from both high-frequency sources and low-frequency 60 Hz AC power equipment can contaminate the data. To suppress…
The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chopping system to perform arbitrary, bunch-by-bunch…
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the…
This contribution reports the design of the main components used to interconnect SRF cavities and superconducting focusing lenses in the SSR Cryomodule beamlines, developed in the framework of the PIP-II project at Fermilab. The focus of…
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a…
The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The…