Related papers: Fermilab PIP-II CDS and CM Cryogenic Controls Syst…

200 papers

An innovative Cylindrical Gas Electron Multiplier (CGEM) detector is under construction for the upgrade of the inner tracker of the BESIII experiment. A novel system has been worked out for the readout of the CGEM detector, including a new…

Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton…

We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the…

The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at…

Accelerator Physics · Physics 2007-05-23 J. Chiba , H. Fujii , K. Furukawa , N. Kamikubota , H. Nakagawa , N. Yamamoto , H. Sakaki , H. Yoshikawa

Integrated photonics offers compact and stable manipulation of optical signals in miniaturized chips, with the possibility of changing dynamically their functionality by means of integrated phase shifters. Cryogenic operation of these…

High performance calorimetry conducted at future hadron colliders, such as the FCC-hh, poses a significant challenge for applying current detector technologies due to unprecedented beam luminosities and radiation fields. Solutions include…

The Phase II upgrade of the ATLAS Muon Spectrometer will involve the installation of approximately 1000 next-generation Resistive Plate Chamber (RPC) singlets. This upgrade aims to enhance detector coverage, increase hit efficiency, and…

Instrumentation and Detectors · Physics 2025-06-23 Aashaq Shah

The use of non-invasive sensors & systems to measure particle beam characteristics is a crucial part of modern accelerator control systems due to their ability to return real time passive measurements without impacting the beam quality.…

Instrumentation and Detectors · Physics 2024-10-25 A. Rouzky , N. Eddy , M. A. Ibrahim

A picoammeter system has been developed and engineering. It consists in a current-voltage converter, based on an operational amplifier with very low input current, a high precision ADC, a radio controlled data acquisition unit and the…

Instrumentation and Detectors · Physics 2018-03-09 M. Bari , B. Gobbo , S. Dalla Torre , M. Gregori , S. Levorato , G. Menon , F. Tessarotto

With the planned turn-on of the PIP-II 800 MeV superconducting proton linac, Fermilab will potentially become the world's best laboratory at which to carry out fundamental muon measurements, sensitive searches for symmetry violation, and…

With the increasing energy demand and the growing integration of renewable sources of energy, power systems face operational challenges such as overloads, losses, and stability concerns, particularly as networks operate near their capacity…

Systems and Control · Electrical Eng. & Systems 2025-07-21 Mohamad Charara , Martin De Montigny , Nivine Abou Daher , Hanane Dagdougui , Antoine Lesage-Landry

The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam…

The first cryomodule for the beam test facility at the Fermilab New-Muon-Lab building is currently under RF commissioning. Among other diagnostics systems, the transverse position of the helium gas return pipe with the connected 1.3 GHz SRF…

Accelerator Physics · Physics 2012-09-25 N. Eddy , B. Fellenz , P. Prieto , A. Semenov , D. C. Voy , M. Wendt

Efficient operation of a submillimeter interferometer requires remote (preferably automated) control of mechanically tuned local oscillators, phase-lock loops, mixers, optics, calibration vanes and cryostats. The present control system for…

Astrophysics · Physics 2020-07-08 T. R. Hunter , R. W. Wilson , R. Kimberk , P. S. Leiker , R. D. Christensen

This paper presents the design of multivariable temperature control for a refrigeration system based on vapor compression employing the internal model control technique. The refrigeration system is based on the PID18 benchmark, which is a…

Systems and Control · Computer Science 2018-10-16 Jairo Viola , Alberto Radici , YangQuan Chen

This report concerns the present status of VEPP-5 control system. The control system hardware consists of CAMAC blocks, a set of crate controllers based on INMOS transputers and ICL-1900 architecture processor Odrenok, and Pentium-based…

High Energy Physics - Experiment · Physics 2007-05-23 D. Yu. Bolkhovityanov , R. G. Gromov , E. A. Gousev , K. V. Gubin , I. L. Pivovarov , O. Yu. Tokarev

We present the development of the FBCM23 ASIC designed for the Phase-II upgrade of the Fast Beam Condition Monitoring (FBCM) system built at the CMS experiment which will replace the present luminometer based on the BCM1F ASIC [1]. The FBCM…

Signal Processing · Electrical Eng. & Systems 2024-02-29 Jan Kaplon , Grzegorz Wegrzyn , Konstantin Shibin , Marnix Barendregt

SPIDER is the prototype ion source of MITICA, the full-size neutral beam heating system conceived for the ITER tokamak. It includes eight drivers to heat and sustain the inductively coupled plasma (ICP). Owing to their near cylindrical…

Plasma Physics · Physics 2023-05-17 D. López-Bruna , P. Jain , M. Recchia , B. Zaniol , E. Sartori , C. Poggi , V. Candeloro , G. Serianni , P. Veltri

We perform the characterization and modeling of a floating-gate device realized with a commercial 350-nm CMOS technology at cryogenic temperature. The programmability of the device offers a solution in the realization of a precise and…

Applied Physics · Physics 2021-10-25 Michele Castriotta , Enrico Prati , Giorgio Ferrari

The strategy used to develop the NIF Integrated Computer Control System (ICCS) calls for incremental cycles of construction and formal test to deliver a total of 1 million lines of code. Each incremental release takes four to six months to…

Software Engineering · Computer Science 2008-11-26 John P. Woodruff , Drew D. Casavant , Barry D. Cline , Michael R. Gorvad