In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the…
Capacitated k-median is one of the few outstanding optimization problems for which the existence of a polynomial time constant factor approximation algorithm remains an open problem. In a series of recent papers algorithms producing…
We study the problem of scheduling a set of jobs with release dates, deadlines and processing requirements (or works), on parallel speed-scaled processors so as to minimize the total energy consumption. We consider that both preemption and…
We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This…
This paper addresses the scheduling problem of coflows in identical parallel networks, which is a well-known $NP$-hard problem. Coflow is a relatively new network abstraction used to characterize communication patterns in data centers. We…
Interval scheduling is a basic problem in the theory of algorithms and a classical task in combinatorial optimization. We develop a set of techniques for partitioning and grouping jobs based on their starting and ending times, that enable…
This paper studies the scheduling of jobs of different families on parallel machines with qualification constraints. Originating from semiconductor manufacturing, this constraint imposes a time threshold between the execution of two jobs of…
In moldable job scheduling, we are provided $m$ identical machines and $n$ jobs that can be executed on a variable number of machines. The execution time of each job depends on the number of machines assigned to execute that job. For the…
We present faster high-accuracy algorithms for computing $\ell_p$-norm minimizing flows. On a graph with $m$ edges, our algorithm can compute a $(1+1/\text{poly}(m))$-approximate unweighted $\ell_p$-norm minimizing flow with…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
The Unsplittable Flow on a Path (UFP) problem has garnered considerable attention as a challenging combinatorial optimization problem with notable practical implications. Steered by its pivotal applications in power engineering, the present…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
We consider the problem of makespan minimization on unrelated machines when job sizes are stochastic. The goal is to find a fixed assignment of jobs to machines, to minimize the expected value of the maximum load over all the machines. For…
We consider two optimization problems in planar graphs. In Maximum Weight Independent Set of Objects we are given a graph $G$ and a family $\mathcal{D}$ of objects, each being a connected subgraph of $G$ with a prescribed weight, and the…
$ $In many optimization problems, a feasible solution induces a multi-dimensional cost vector. For example, in load-balancing a schedule induces a load vector across the machines. In $k$-clustering, opening $k$ facilities induces an…
Coflow is a network abstraction used to represent communication patterns in data centers. The coflow scheduling problem encountered in large data centers is a challenging $\mathcal{NP}$-hard problem. This paper tackles the scheduling…
We consider a classical scheduling problem on $m$ identical machines. For an arbitrary constant $q>1$, the aim is to assign jobs to machines such that $\sum_{i=1}^m C_i^q$ is minimized, where $C_i$ is the total processing time of jobs…
We study the classic problem of scheduling $n$ precedence constrained unit-size jobs on $m = O(1)$ machines so as to minimize the makespan. In a recent breakthrough, Levey and Rothvoss \cite{LR16} developed a $(1+\epsilon)$-approximation…
A very well-known machine model in scheduling allows the machines to be unrelated, modelling jobs that might have different characteristics on each machine. Due to its generality, many optimization problems of this form are very difficult…
Many modern datacenter applications involve large-scale computations composed of multiple data flows that need to be completed over a shared set of distributed resources. Such a computation completes when all of its flows complete. A useful…