English

Tight running times for minimum $\ell_q$-norm load balancing: beyond exponential dependencies on $1/\epsilon$

Computational Complexity 2021-07-14 v1

Abstract

We consider a classical scheduling problem on mm identical machines. For an arbitrary constant q>1q>1, the aim is to assign jobs to machines such that i=1mCiq\sum_{i=1}^m C_i^q is minimized, where CiC_i is the total processing time of jobs assigned to machine ii. It is well known that this problem is strongly NP-hard. Under mild assumptions, the running time of an (1+ϵ)(1+\epsilon)-approximation algorithm for a strongly NP-hard problem cannot be polynomial on 1/ϵ1/\epsilon, unless P=NP\text{P}=\text{NP}. For most problems in the literature, this translates into algorithms with running time at least as large as 2Ω(1/ε)+nO(1)2^{\Omega(1/\varepsilon)}+n^{O(1)}. For the natural scheduling problem above, we establish the existence of an algorithm which violates this threshold. More precisely, we design a PTAS that runs in 2O~(1/ϵ)+nO(1)2^{\tilde{O}(\sqrt{1/\epsilon})}+n^{O(1)} time. This result is in sharp contrast to the closely related minimum makespan variant, where an exponential lower bound is known under the exponential time hypothesis (ETH). We complement our result with an essentially matching lower bound on the running time, showing that our algorithm is best-possible under ETH. The lower bound proof exploits new number-theoretical constructions for variants of progression-free sets, which might be of independent interest. Furthermore, we provide a fine-grained characterization on the running time of a PTAS for this problem depending on the relation between ϵ\epsilon and the number of machines mm. More precisely, our lower bound only holds when m=Θ(1/ϵ)m=\Theta(\sqrt{1/\epsilon}). Better algorithms, that go beyond the lower bound, exist for other values of mm. In particular, there even exists an algorithm with running time polynomial in 1/ϵ1/\epsilon if we restrict ourselves to instances with m=Ω(1/ϵlog21/ϵ)m=\Omega(1/\epsilon\log^21/\epsilon).

Keywords

Cite

@article{arxiv.2107.06261,
  title  = {Tight running times for minimum $\ell_q$-norm load balancing: beyond exponential dependencies on $1/\epsilon$},
  author = {Lin Chen and Liangde Tao and José Verschae},
  journal= {arXiv preprint arXiv:2107.06261},
  year   = {2021}
}