The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
A distributed network is modeled by a graph having $n$ nodes (processors) and diameter $D$. We study the time complexity of approximating {\em weighted} (undirected) shortest paths on distributed networks with a $O(\log n)$ {\em bandwidth…
In Polyamorous Scheduling, we are given an edge-weighted graph and must find a periodic schedule of matchings in this graph which minimizes the maximal weighted waiting time between consecutive occurrences of the same edge. This NP-hard…
In this work, we study the computational (parameterized) complexity of $P \mid r_j, p_j=p \mid \sum_j w_j U_j$. Here, we are given $m$ identical parallel machines and $n$ jobs with equal processing time, each characterized by a release…
This work proposes a method for sparse polynomial chaos (PC) approximation of high-dimensional stochastic functions based on non-adapted random sampling. We modify the standard l1 -minimization algorithm, originally proposed in the context…
As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and…
Many problems are NP-hard and, unless P = NP, do not admit polynomial-time exact algorithms. The fastest known exact algorithms exactly usually take time exponential in the input size. Much research effort has gone into obtaining faster…
In parallel machine scheduling, we are given a set of jobs, together with a number of machines and our goal is to decide for each job, when and on which machine(s) it should be scheduled in order to minimize some objective function.…
We consider the following single-machine scheduling problem, which is often denoted $1||\sum f_{j}$: we are given $n$ jobs to be scheduled on a single machine, where each job $j$ has an integral processing time $p_j$, and there is a…
Constant-factor, polynomial-time approximation algorithms are presented for two variations of the traveling salesman problem with time windows. In the first variation, the traveling repairman problem, the goal is to find a tour that visits…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
We present an $(1+\varepsilon)$-approximation algorithm with quasi-polynomial running time for computing the maximum weight independent set of polygons out of a given set of polygons in the plane (specifically, the running time is $n^{O(…
Coflow is a recently proposed network abstraction for data-parallel computing applications. This paper considers scheduling coflows with precedence constraints in identical parallel networks, such as to minimize the total weighted…
We study the scheduling of flows on a switch with the goal of optimizing metrics related to the response time of the flows. The input to the problem is a sequence of flow requests on a switch, where the switch is represented by a bipartite…
The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased…
In this paper, we propose a general framework to design {efficient} polynomial time approximation schemes (EPTAS) for fundamental stochastic combinatorial optimization problems. Given an error parameter $\epsilon>0$, such algorithmic…
We consider a single machine scheduling problem that seeks to minimize a generalized cost function: given a subset of jobs we must order them so as to minimize $\sum f_j(C_j)$, where $C_j$ is the completion time of job $j$ and $f_j$ is a…
Binary quadratic programming problems have attracted much attention in the last few decades due to their potential applications. This type of problems are NP-hard in general, and still considered a challenge in the design of efficient…
We consider a general load balancing problem on parallel machines. Our machine environment in particular generalizes the standard models of identical machines, and the model of uniformly related machines, as well as machines with a constant…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…