Related papers: On Minimizing Generalized Makespan on Unrelated Ma…
We consider a classical scheduling problem on $m$ identical machines. For an arbitrary constant $q>1$, the aim is to assign jobs to machines such that $\sum_{i=1}^m C_i^q$ is minimized, where $C_i$ is the total processing time of jobs…
The existence of a minimal measurable length is a common feature of various approaches to quantum gravity such as string theory, loop quantum gravity and black-hole physics. In this scenario, all commutation relations are modified and the…
We study the problem of generalized uniformity testing \cite{BC17} of a discrete probability distribution: Given samples from a probability distribution $p$ over an {\em unknown} discrete domain $\mathbf{\Omega}$, we want to distinguish,…
We investigate multiple fundamental variants of the classic coordinated motion planning (CMP) problem for unit square robots in the plane under the $L_1$ metric. In coordinated motion planning, we are given two arrangements of $k$ robots…
Conditional density estimation is complicated by multimodality, heteroscedasticity, and strong non-Gaussianity. Gaussian processes (GPs) provide a principled nonparametric framework with calibrated uncertainty, but standard GP regression is…
Generalized majority-minority (GMM) operations are introduced as a common generalization of near unanimity operations and Mal'tsev operations on finite sets. We show that every instance of the constraint satisfaction problem (CSP), where…
Parameterizing by the largest processing time $p_{max}$ and the number of different job processing times $d$, we propose a proximity technique for High-Multiplicity Scheduling on Uniform Machines for the objectives Makespan Minimization…
An instance of the Constraint Satisfaction Problem (CSP) is given by a family of constraints on overlapping sets of variables, and the goal is to assign values from a fixed domain to the variables so that all constraints are satisfied. In…
We study the classic problem of minimizing the expected total completion time of jobs on $m$ identical machines in the setting where the sizes of the jobs are stochastic. Specifically, the size of each job is a random variable whose…
We study bicriteria versions of Makespan Minimization on Unrelated Machines and Santa Claus by allowing a constrained number of rejections. Given an instance of Makespan Minimization on Unrelated Machines where the optimal makespan for…
We consider the minimum makespan problem for $n$ tasks and two unrelated parallel selfish machines. Let $R_n$ be the best approximation ratio of randomized monotone scale-free algorithms. This class contains the most efficient algorithms…
We study the problem of non-preemptively scheduling $n$ jobs, each job $j$ with a release time $t_j$, a deadline $d_j$, and a processing time $p_j$, on $m$ parallel identical machines. Cieliebak et al. (2004) considered the two constraints…
Shortened abstract: Given a constrained minimization problem, under what conditions does there exist a related, unconstrained problem having the same minimum points? This basic question in global optimization motivates this paper, which…
There is a long history of approximation schemes for the problem of scheduling jobs on identical machines to minimize the makespan. Such a scheme grants a $(1+\epsilon)$-approximation solution for every $\epsilon > 0$, but the running time…
We consider the Pm || Cmax scheduling problem where the goal is to schedule n jobs on m identical parallel machines to minimize makespan. We revisit the famous Longest Processing Time (LPT) rule proposed by Graham in 1969. LPT requires to…
We present a unified framework for minimizing average completion time for many seemingly disparate online scheduling problems, such as the traveling repairperson problems (TRP), dial-a-ride problems (DARP), and scheduling on unrelated…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
Motivated by mail delivery scheduling problems arising in Royal Mail, we study a generalization of the fundamental makespan scheduling P||Cmax problem which we call the bounded job start scheduling problem. Given a set of jobs, each…
The quantum k-Local Hamiltonian problem is a natural generalization of classical constraint satisfaction problems (k-CSP) and is complete for QMA, a quantum analog of NP. Although the complexity of k-Local Hamiltonian problems has been well…