Related papers: On Minimizing Generalized Makespan on Unrelated Ma…
The problem of scheduling jobs on parallel machines (identical, uniform, or unrelated), under incompatibility relation modeled as a block graph, under the makespan optimality criterion, is considered in this paper. No two jobs that are in…
Constraint satisfaction problems (CSPs) consist of a set of variables taking values from some finite domain and a set of local constraints on these variables. The objective is to find an assignment to the variables that maximizes the…
We present a unified framework for designing deterministic monotone polynomial time approximation schemes (PTAS's) for a wide class of scheduling problems on uniformly related machines. This class includes (among others) minimizing the…
We provide new (parameterized) computational hardness results for Interval Scheduling on Unrelated Machines. It is a classical scheduling problem motivated from just-in-time or lean manufacturing, where the goal is to complete jobs exactly…
Group synchronization refers to estimating a collection of group elements from the noisy pairwise measurements. Such a nonconvex problem has received much attention from numerous scientific fields including computer vision, robotics, and…
Mixed-integer linear programming (MILP) is at the core of many advanced algorithms for solving fundamental problems in combinatorial optimization. The complexity of solving MILPs directly correlates with their support size, which is the…
We study the problem of scheduling $m$ tasks to $n$ selfish, unrelated machines in order to minimize the makespan, where the execution times are independent random variables, identical across machines. We show that the VCG mechanism, which…
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
The growing prevalence of nonsmooth optimization problems in machine learning has spurred significant interest in generalized smoothness assumptions. Among these, the (L0, L1)-smoothness assumption has emerged as one of the most prominent.…
We study a variant of the Coordinated Motion Planning problem on undirected graphs, referred to herein as the \textsc{Coordinated Sliding-Motion Planning} (CSMP) problem. In this variant, we are given an undirected graph $G$, $k$ robots…
This paper addresses the scheduling problem on two identical parallel machines with a single server in charge of loading and unloading operations of jobs. Each job has to be loaded by the server before being processed on one of the two…
This paper considers the scheduling of stochastic jobs on parallel identical machines to minimize the expected total weighted completion time. While this is a classical problem with a significant body of research on approximation algorithms…
We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…
We study the makespan minimization problem with unrelated selfish machines under the assumption that job sizes are stochastic. We design simple truthful mechanisms that under various distributional assumptions provide constant and…
Recently, the problem of multitasking scheduling has attracted a lot of attention in the service industries where workers frequently perform multiple tasks by switching from one task to another. Hall, Leung and Li (Discrete Applied…
We study approximability of regular constraint satisfaction problems, i.e., CSPs where each variable in an instance has the same number of occurrences. In particular, we show that for any CSP $\Lambda$, existence of an $\alpha$…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…
We consider the Demand Strip Packing problem (DSP), in which we are given a set of jobs, each specified by a processing time and a demand. The task is to schedule all jobs such that they are finished before some deadline $D$ while…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
Gaussian process ($GP$) regression is a widely used non-parametric modeling tool, but its cubic complexity in the training size limits its use on massive data sets. A practical remedy is to predict using only the nearest neighbours of each…