We study the scheduling problem of makespan minimization while taking machine conflicts into account. Machine conflicts arise in various settings, e.g., shared resources for pre- and post-processing of tasks or spatial restrictions. In this…
We revisit two well-studied scheduling problems in the unrelated machines setting where each job can have a different processing time on each machine. For minimizing total weighted completion time we give a 1.45-approximation, which…
In a classical problem in scheduling, one has $n$ unit size jobs with a precedence order and the goal is to find a schedule of those jobs on $m$ identical machines as to minimize the makespan. It is one of the remaining four open problems…
The (Non-Preemptive) Throughput Maximization problem is a natural and fundamental scheduling problem. We are given $n$ jobs, where each job $j$ is characterized by a processing time and a time window, contained in a global interval $[0,T)$,…
We consider the problem of approximating the reachability probabilities in Markov decision processes (MDP) with uncountable (continuous) state and action spaces. While there are algorithms that, for special classes of such MDP, provide a…
Malleable scheduling is a model that captures the possibility of parallelization to expedite the completion of time-critical tasks. A malleable job can be allocated and processed simultaneously on multiple machines, occupying the same time…
We study the general scheduling problem (GSP) which generalizes and unifies several well-studied preemptive single-machine scheduling problems, such as weighted flow time, weighted sum of completion time, and minimizing the total weight of…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines.…
In this paper, we study the uniform capacitated $k$-median problem. Obtaining a constant approximation algorithm for this problem is a notorious open problem; most previous works gave constant approximations by either violating the capacity…
We consider the following special case of minimizing makespan. A set of jobs $J$ and a set of machines $M$ are given. Each job $j \in J$ can be scheduled on a machine from a subset $M_j$ of $M$. The processing time of $j$ is the same on all…
We consider a single machine scheduling problem that seeks to minimize a generalized cost function: given a subset of jobs we must order them so as to minimize $\sum f_j(C_j)$, where $C_j$ is the completion time of job $j$ and $f_j$ is a…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
We consider the classical makespan minimization scheduling problem where $n$ jobs must be scheduled on $m$ identical machines. Using weighted random sampling, we developed two sublinear time approximation schemes: one for the case where $n$…
Mirror-prox (MP) is a well-known algorithm to solve variational inequality (VI) problems. VI with a monotone operator covers a large group of settings such as convex minimization, min-max or saddle point problems. To get a convergent…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
Makespan scheduling on identical machines is one of the most basic and fundamental packing problems studied in the discrete optimization literature. It asks for an assignment of $n$ jobs to a set of $m$ identical machines that minimizes the…
In online makespan minimization a sequence of jobs $\sigma = J_1,..., J_n$ has to be scheduled on $m$ identical parallel machines so as to minimize the maximum completion time of any job. We investigate the problem with an essentially new…
The goal in {\em reconfiguration problems} is to compute a {\em gradual transformation} between two feasible solutions of a problem such that all intermediate solutions are also feasible. In the {\em Matching Reconfiguration Problem} (MRP),…
We consider the following general scheduling problem: The input consists of n jobs, each with an arbitrary release time, size, and a monotone function specifying the cost incurred when the job is completed at a particular time. The…
We consider a general load balancing problem on parallel machines. Our machine environment in particular generalizes the standard models of identical machines, and the model of uniformly related machines, as well as machines with a constant…