A central problem in scheduling is to schedule $n$ unit size jobs with precedence constraints on $m$ identical machines so as to minimize the makespan. For $m=3$, it is not even known if the problem is NP-hard and this is one of the last…
In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…
Bender et al. (SPAA 2013) have proposed a theoretical framework for testing in contexts where safety mistakes must be avoided. Testing in such a context is made by machines that need to be often calibrated. Given that calibration costs, it…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
A very well-known machine model in scheduling allows the machines to be unrelated, modelling jobs that might have different characteristics on each machine. Due to its generality, many optimization problems of this form are very difficult…
Coflow is a network abstraction used to represent communication patterns in data centers. The coflow scheduling problem encountered in large data centers is a challenging $\mathcal{NP}$-hard problem. This paper tackles the scheduling…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
We study the classic problem of scheduling $n$ precedence constrained unit-size jobs on $m = O(1)$ machines so as to minimize the makespan. In a recent breakthrough, Levey and Rothvoss \cite{LR16} developed a $(1+\epsilon)$-approximation…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines.…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…
Makespan scheduling on identical machines is one of the most basic and fundamental packing problems studied in the discrete optimization literature. It asks for an assignment of $n$ jobs to a set of $m$ identical machines that minimizes the…
We are given a set of $n$ jobs and a single processor that can vary its speed dynamically. Each job $J_j$ is characterized by its processing requirement (work) $p_j$, its release date $r_j$ and its deadline $d_j$. We are also given a budget…
Motivated by applications in grid computing and project management, we study multiprocessor scheduling in scenarios where there is uncertainty in the successful execution of jobs when assigned to processors. We consider the problem of…
We study ordinal makespan scheduling on small numbers of identical machines, with respect to two parallel solutions. In ordinal scheduling, it is known that jobs are sorted by non-increasing sizes, but the specific sizes are not known in…
This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the…
We consider a special case of the ordinary NP-hard two-machine flow shop problem with the objective of determining simultaneously a minimal common due date and the minimal number of tardy jobs. In [S. S. Panwalkar, C. Koulamas, An O(n^2)…
We consider the problem of scheduling a set of jobs on a set of identical parallel machines, with the aim of minimizing the total weighted completion time. The problem has been solved in the literature with a number of mathematical…