Related papers: Improved approximation schemes for early work sche…
In parallel machine scheduling, we are given a set of jobs, together with a number of machines and our goal is to decide for each job, when and on which machine(s) it should be scheduled in order to minimize some objective function.…
Given n jobs with release dates, deadlines and processing times we consider the problem of scheduling them on m parallel machines so as to minimize the total energy consumed. Machines can enter a sleep state and they consume no energy in…
In this paper we consider the problem of scheduling on parallel machines with a presence of incompatibilities between jobs. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of…
Generalizing many well-known and natural scheduling problems, scheduling with job-specific cost functions has gained a lot of attention recently. In this setting, each job incurs a cost depending on its completion time, given by a private…
In malleable job scheduling, jobs can be executed simultaneously on multiple machines with the processing time depending on the number of allocated machines. In this setting, jobs are required to be executed non-preemptively and in unison,…
The NP-hard scheduling problem P||C_max encompasses a set of tasks with known execution time which must be mapped to a set of identical machines such that the overall completion time is minimized. In this work, we improve existing…
In real-time systems, in addition to the functional correctness recurrent tasks must fulfill timing constraints to ensure the correct behavior of the system. Partitioned scheduling is widely used in real-time systems, i.e., the tasks are…
In the classical interval scheduling type of problems, a set of $n$ jobs, characterized by their start and end time, need to be executed by a set of machines, under various constraints. In this paper we study a new variant in which the jobs…
This paper studies a generalized busy-time scheduling model on heterogeneous machines. The input to the model includes a set of jobs and a set of machine types. Each job has a size and a time interval during which it should be processed.…
We study the Multiple Cluster Scheduling problem and the Multiple Strip Packing problem. For both problems, there is no algorithm with approximation ratio better than $2$ unless $P = NP$. In this paper, we present an algorithm with…
A prominent problem in scheduling theory is the weighted flow time problem on one machine. We are given a machine and a set of jobs, each of them characterized by a processing time, a release time, and a weight. The goal is to find a…
The task of finding efficient production schedules for parallel machines is a challenge that arises in most industrial manufacturing domains. There is a large potential to minimize production costs through automated scheduling techniques,…
We study the problem of executing an application represented by a precedence task graph on a parallel machine composed of standard computing cores and accelerators. Contrary to most existing approaches, we distinguish the allocation and the…
The active-time scheduling problem considers the problem of scheduling preemptible jobs with windows (release times and deadlines) on a parallel machine that can schedule up to $g$ jobs during each timestep. The goal in the active-time…
We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…
We consider here the MultiBot problem for the scheduling and the resource parametrization of jobs related to the production or the transportation of different products inside a given time horizon. Those jobs must meet known in advance…
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
In this study, we investigate a scheduling problem on identical machines in which jobs require initial setup before execution. We assume that an algorithm can dynamically form a batch (i.e., a collection of jobs to be processed together)…
The performance of anytime algorithms can be improved by simultaneously solving several instances of algorithm-problem pairs. These pairs may include different instances of a problem (such as starting from a different initial state),…
We consider the classic scheduling problem of minimizing the total weighted flow-time on a single machine (min-WPFT), when preemption is allowed. In this problem, we are given a set of $n$ jobs, each job having a release time $r_j$, a…