Approximation algorithms for coupled task scheduling minimizing the sum of completion times

Optimization and Control 2024-05-03 v2

Abstract

In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several variants of this problem that are known to be NP-hard, while also proving NP-hardness for two variants whose complexity was unknown before. Using these results, together with constant-factor approximations for the makespan objective from the literature, we also introduce the first results on bi-objective approximation in the coupled task setting.

Keywords

Cite

@article{arxiv.2207.00394,
  title  = {Approximation algorithms for coupled task scheduling minimizing the sum of completion times},
  author = {David Fischer and Péter Györgyi},
  journal= {arXiv preprint arXiv:2207.00394},
  year   = {2024}
}

Comments

25 pages, 9 figures

R2 v1 2026-06-24T12:11:04.473Z