In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
Malleable scheduling is a model that captures the possibility of parallelization to expedite the completion of time-critical tasks. A malleable job can be allocated and processed simultaneously on multiple machines, occupying the same time…
We investigate the global scheduling of sporadic, implicit deadline, real-time task systems on multiprocessor platforms. We provide a task model which integrates job parallelism. We prove that the time-complexity of the feasibility problem…
The task of scheduling jobs to machines while minimizing the total makespan, the sum of weighted completion times, or a norm of the load vector, are among the oldest and most fundamental tasks in combinatorial optimization. Since all of…
In online makespan minimization a sequence of jobs $\sigma = J_1,..., J_n$ has to be scheduled on $m$ identical parallel machines so as to minimize the maximum completion time of any job. We investigate the problem with an essentially new…
We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with…
We consider the following special case of minimizing makespan. A set of jobs $J$ and a set of machines $M$ are given. Each job $j \in J$ can be scheduled on a machine from a subset $M_j$ of $M$. The processing time of $j$ is the same on all…
In this paper, we are interested in parallel identical machine scheduling problems with preemption and release dates in case of a regular criterion to be minimized. We show that solutions having a permutation flow shop structure are…
We study a sequential resource allocation problem involving a fixed number of recurring jobs. At each time-step the manager should distribute available resources among the jobs in order to maximise the expected number of completed jobs.…
Given a system model where machines have distinct speeds and power ratings but are otherwise compatible, we consider various problems of scheduling under resource constraints on the system which place the restriction that not all machines…
We consider several combinatorial optimization problems which combine the classic shop scheduling problems, namely open shop scheduling or job shop scheduling, and the shortest path problem. The objective of the obtained problem is to…
In malleable job scheduling, jobs can be executed simultaneously on multiple machines with the processing time depending on the number of allocated machines. In this setting, jobs are required to be executed non-preemptively and in unison,…
This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the…
This paper considers a combination of the joint replenishment problem with single machine scheduling. There is a single resource, which is required by all the jobs, and a job can be started at time point $t$ on the machine if and only the…
We consider a 1-machine scheduling problem where the temperature of a job rises during processing, and cools down when not being processed according to given linear heating and cooling rates. No job's temperature is allowed to rise above a…
The performance of anytime algorithms can be improved by simultaneously solving several instances of algorithm-problem pairs. These pairs may include different instances of a problem (such as starting from a different initial state),…
We consider the problem of scheduling a set of jobs on a set of identical parallel machines, with the aim of minimizing the total weighted completion time. The problem has been solved in the literature with a number of mathematical…
This paper examines scheduling problem denoted as $P|seq, ser|C_{max}$ in Graham's notation; in other words, scheduling of tasks on parallel identical machines ($P$) with sequence-dependent setups ($seq$) each performed by one of the…
Consider the problem where $n$ jobs, each with a release time, a deadline and a required processing time are to be feasibly scheduled in a single- or multi-processor setting so as to minimize the total energy consumption of the schedule. A…
Modern computing workloads are often composed of parallelizable jobs. A parallelizable job can be completed more quickly when run on additional servers. However, each job can only use a limited number of servers, known as its…