Related papers: Parallel Machine Scheduling with a Single Resource…
The scheduling literature has traditionally focused on a single type of resource (e.g., computing nodes). However, scientific applications in modern High-Performance Computing (HPC) systems process large amounts of data, hence have diverse…
In this work we revisit the elementary scheduling problem $1||\sum p_j U_j$. The goal is to select, among $n$ jobs with processing times and due dates, a subset of jobs with maximum total processing time that can be scheduled in sequence…
We consider the following single-machine scheduling problem, which is often denoted $1||\sum f_{j}$: we are given $n$ jobs to be scheduled on a single machine, where each job $j$ has an integral processing time $p_j$, and there is a…
We consider a problem of scheduling rigid parallel jobs on variable speed processors so as to minimize the total energy consumption. Each job is specified by its processing volume and the required number of processors. We propose new…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
We study the computational complexity of scheduling jobs on a single speed-scalable processor with the objective of capturing the trade-off between the (weighted) flow time and the energy consumption. This trade-off has been extensively…
We consider a natural scheduling problem which arises in many distributed computing frameworks. Jobs with diverse resource requirements (e.g. memory requirements) arrive over time and must be served by a cluster of servers, each with a…
Consider the classical Min-Sum Set Cover problem: We are given a universe $\mathcal{U}$ of $n$ elements and a collection $\mathcal{S}$ of $k$ subsets of $\mathcal{U}$. Moreover, a cost function is associated with each set. The goal is to…
The problem of attaining energy efficiency in distributed systems is of importance, but a general, non-domain-specific theory of energy-minimal scheduling is far from developed. In this paper, we classify the problems of energy-minimal…
We study the scheduling problem of makespan minimization while taking machine conflicts into account. Machine conflicts arise in various settings, e.g., shared resources for pre- and post-processing of tasks or spatial restrictions. In this…
We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…
In this paper we consider a combination of the joint replenishment problem (JRP) and single machine scheduling with release dates. There is a single machine and one or more item types. Each job has a release date, a positive processing…
We consider the two-parallel machines scheduling problem, with the aim of minimizing the maximum lateness and the makespan. Formally, the problem is defined as follows. We have to schedule a set J of n jobs on two identical machines. Each…
We consider the online busy time scheduling problem motivated by energy and cost minimization in cloud computing systems. The input is a set of jobs $J=\{1,\dots,n\}$ where each job $j\in J$ has a release time $r_j$, deadline $d_j$, and…
The Windows Scheduling Problem, also known as the Pinwheel Problem, is to schedule periodic jobs subject to their processing frequency demands. Instances are given as a set of jobs that have to be processed infinitely often such that the…
In the paper we consider the problem of scheduling $n$ identical jobs on 4 uniform machines with speeds $s_1 \geq s_2 \geq s_3 \geq s_4,$ respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are…
We consider a single machine scheduling problem that seeks to minimize a generalized cost function: given a subset of jobs we must order them so as to minimize $\sum f_j(C_j)$, where $C_j$ is the completion time of job $j$ and $f_j$ is a…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…
In moldable job scheduling, we are provided $m$ identical machines and $n$ jobs that can be executed on a variable number of machines. The execution time of each job depends on the number of machines assigned to execute that job. For the…