Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was…
Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton…
This article reports the first operation of a double-sided CMOS pixelated ladder in a collider experiment, namely in the inner tracker volume of the Belle II experiment during the Phase 2 run of the SuperKEKB collider. Design and…
The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam…
PIP-II beam transfer line (BTL) to transport the beam from PIP-II Linac to the Booster ring at Fermilab. One crucial aspect of the BTL design involved the implementation of collimators. These collimators play a vital role in removing large…
The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the…
The PIP-II project at Fermilab, which includes an 800-MeV superconducting LINAC, demands rigorous radiation shielding optimization to meet safety requirements. We updated the MARS geometry model to reflect new magnet and collimator designs…
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments.…
As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and…
The Fermilab Proton Improvement Plan (PIP) was formed in late 2011 to address important and necessary upgrades to the Proton Source machines (Injector line, Linac and Booster). The goal is to increase the proton flux by doubling the Booster…
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the…
Preinjector VEPP-5 electron linac consists of two linear accelerators on energy 300 MeV and 510 MeV and includes 14 accelerating structures [1]. First accelerating structures both linacs have increased average rate of acceleration 25-30…
The present contribution reports the design of the pre-production Single Spoke Resonator Type 2 Cryomodule (ppSSR2 CM), developed in the framework of the PIP-II project at Fermilab. The innovative design is based on a structure, the…
The kicker control system was used for beam extraction and injection between two cooling storage rings (CSRs) at the Heavy Ion Research Facility in Lanzhou (HIRFL). To meet the requirements of special physics experiments, the kicker…
The Fermilab Side-Coupled Linac accelerates H-beam from 116 MeV to 400 MeV through seven 805 MHz modules. Twelve wire scanners are present in the Side Coupled Linac and four are present in the transfer line between the Linac and the Booster…
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This…
The CLIC damping rings will produce ultra-low emittance beam, with high bunch charge, necessary for the luminosity performance of the collider. To limit the beam emittance blow-up due to oscillations, the pulse power modulators for the…
The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The…
The PIP-II Project will see international shipment of cryomodules from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic…
The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a new 800 MeV superconducting linac and a Beam Transfer Line (BTL) to transport the beam to the existing Booster…