Related papers: First Performance Results Of The PIP2IT MEBT 200 O…
The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's particle accelerator complex to enable the world's most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come.…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole…
The U.S. Particle Physics Project Prioritization Panel (P5) report encouraged the realization of Fermilab's Proton Improvement Plan II (PIP-II) to support future neutrino programs in the United States. PIP-II aims at enhancing the…
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a…
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's…
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary…
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under…
A 2.1 MeV, 10 mA CW RFQ has been installed and commissioned at Fermilab's test accelerator known as PIP-II Injector Test. This report describes the measurements of the beam properties after acceleration in the RFQ, including the energy and…
Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the…
The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam…
The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H- ions to 800 MeV kinetic energy before injection…
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…
The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC…
This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice…
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw…
Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The…
In Fermilab's PIP-II machine protection system, beam loss signals from various detectors are digitized at 125 MS/s. Noise from both high-frequency sources and low-frequency 60 Hz AC power equipment can contaminate the data. To suppress…
Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…