Related papers: First Performance Results Of The PIP2IT MEBT 200 O…
The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…
The UNILAC was improved for high current performance by replacing the Wideroe prestripper accelerator by an RFQ and an IH-type DTL. In addition, one of two ion source terminals was equipped with high current sources of MUCIS- and…
A high-resolution, intratrain position feedback system has been developed to achieve and maintain collisions at the proposed future electron-positron International Linear Collider (ILC). A prototype has been commissioned and tested with a…
The Proton Improvement Plan II (PIP-II) project is a vital upgrade to the Fermilab accelerator complex. The magnet pulse rate of the PIP-II Injection system requires an increase from the current rate of 15 Hz to 20 Hz as well as a roughly…
Project-X is a leading candidate of the next major accelerator construction project at Fermilab. The mission need of Project-X is to establish an intensity frontier for particle physics research, or more precisely, to build a multi-MW…
For the CLIC two-beam scheme, a high-current, long-pulse drive beam is required for RF power generation. Taking advantage of the 3 GHz klystrons available at the LEP injector once LEP stops, a 180 MeV electron accelerator is being…
The development of magnetic cogging is part of the Fermilab Booster upgrade within the Proton Improvement Plan (PIP). The Booster is going to send 2.25E17 protons/hour which is almost double the present flux, 1.4E17 protons/hour to the Main…
The MTA beam line has been specifically designed to facilitate measurements of the Fermilab Linac beam emittance and properties utilizing a long, 10m, element-free straight. Linac beam is extracted downstream of the 400-MeV electrostatic…
A collaboration between Fermilab and the Institute for High Energy Physics (IHEP), Beijing, has developed a beam position monitor for the IHEP test beam facility. This telescope is based on 5 stations of silicon strip detectors having a…
The energy of a bunched non-relativistic ion beam can be deduced from measuring the beam phases in neighbouring Beam Position Monitors (BPMs). This report discusses implementation of such a procedure at the PIP-II H- linac being constructed…
The Intermediate Silicon Tracker (INTT), a two-layer barrel silicon strip tracker, is a key component of the tracking system for sPHENIX at the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory. The INTT is designed…
The CLIC study of a high-energy (0.5 - 5 TeV), high-luminosity (1034 - 1035 cm-2 sec-1) e+e- linear collider is presented. Beam acceleration using high frequency (30 GHz) normal-conducting structures operating at high accelerating fields…
The second phase accelerator for the Dual Axis Hydrodynamic Test facility (DARHT) is designed to provide an electron beam pulse that is 2 microsec long, 2kA, and 20 MeV in particle energy. The injector provides 3.2 MeV so that the linac…
The future Belle II experiment will employ a computer-farm based data reduction system for the readout of its innermost detector, a DEPFET-technology based silicon detector with pixel readout. A large fraction of the background hits can be…
An all solid-state kicker modulator for the Dual-Axis Radiographic Hydrodynamic Test facility (DARHT-2) has been designed and tested. This kicker modulator uses multiple solid-state modules stacked in an inductive-adder configuration where…
The performance of scintillator counters with embedded wavelength-shifting fibers has been measured in the Fermilab Meson Test Beam Facility using 120 GeV protons. The counters were extruded with a titanium dioxide surface coating and two…
Phase-3 testing of the pHB650 cryomodule at the PIP-II Injector Test Facility was conducted to evaluate the effectiveness of heat load mitigations performed after earlier phases of testing and to continue pinpointing any sources of…
The GSI Unilac was upgraded as a high current injector for the SIS in 1999. Therefore, the stripping section [1] at 1.4 MeV/u, where a beam transport under highest space charge conditions and multi beam operation had to be established, was…
Since May 1999 the BABAR detector has been taking data at the PEP-II asymmetric electron-positron collider at the Stanford Linear Accelerator Center, California. This experiment requires a very large data sample and the PEP-II accelerator…
The design and tests of Timing Counter elements for the upgrade of the MEG experiment, MEG II,is presented. The detector is based on several small plates of scintillator with a Silicon PhotoMultipliers dual-side readout. The optimisation of…