English
Related papers

Related papers: Approximation Algorithms for the Open Shop Problem…

200 papers

We consider several combinatorial optimization problems which combine the classic shop scheduling problems, namely open shop scheduling or job shop scheduling, and the shortest path problem. The objective of the obtained problem is to…

Data Structures and Algorithms · Computer Science 2013-09-03 Kameng Nip , Zhenbo Wang , Wenxun Xing

In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the…

Computational Complexity · Computer Science 2019-07-09 Marten Maack , Klaus Jansen

In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…

Optimization and Control · Mathematics 2014-12-17 Anna Romanova

In this paper, we consider four single-machine scheduling problems with release times, with the aim of minimizing the maximum lateness. In the first problem we have a common deadline for all the jobs. The second problem looks for the Pareto…

Data Structures and Algorithms · Computer Science 2017-08-18 Imed Kacem , Hans Kellerer

A mixed shop is a manufacturing infrastructure designed to process a mixture of a set of flow-shop jobs and a set of open-shop jobs. Mixed shops are in general much more complex to schedule than flow-shops and open-shops, and have been…

Data Structures and Algorithms · Computer Science 2018-09-18 Longcheng Liu , Yong Chen , Jianming Dong , Randy Goebel , Guohui Lin , Yue Luo , Guanqun Ni , Bing Su , An Zhang

This paper studies a combinatorial optimization problem which is obtained by combining the flow shop scheduling problem and the shortest path problem. The objective of the obtained problem is to select a subset of jobs that constitutes a…

Data Structures and Algorithms · Computer Science 2013-09-03 Kameng Nip , Zhenbo Wang , Fabrice Talla Nobibon , Roel Leus

This paper resolves a long-standing open question in bicriteria scheduling regarding the complexity of a single machine scheduling problem which combines the number of tardy jobs and the maximal tardiness criteria. We use the lexicographic…

Data Structures and Algorithms · Computer Science 2025-02-17 Klaus Heeger , Danny Hermelin , Michael L. Pinedo , Dvir Shabtay

Various new scheduling problems have been arising from practical production processes and spawning new research areas in the scheduling field. We study the parallel multi-stage open shops problem, which generalizes the classic open shop…

Data Structures and Algorithms · Computer Science 2022-05-31 Jianming Dong , Ruyan Jin , Guohui Lin , Bing Su , Weitian Tong , Yao Xu

We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…

Data Structures and Algorithms · Computer Science 2018-12-03 Lin Chen , Nicole Megow , Roman Rischke , Leen Stougie , José Verschae

We consider the routing flow shop problem with two machines on an asymmetric network. For this problem we discuss properties of an optimal schedule and present a polynomial time algorithm assuming the number of nodes of the network to be…

Discrete Mathematics · Computer Science 2020-05-14 Ilya Chernykh , Alexander Kononov , Sergey Sevastyanov

We study classic scheduling problems on uniformly related machines. Efficient polynomial time approximation schemes (EPTAS's) are fast and practical approximation schemes. New methods and techniques are essential in developing such improved…

Data Structures and Algorithms · Computer Science 2014-04-04 Leah Epstein , Asaf Levin

We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…

Data Structures and Algorithms · Computer Science 2015-10-30 Kameng Nip , Zhenbo Wang , Zizhuo Wang

In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…

Optimization and Control · Mathematics 2024-05-03 David Fischer , Péter Györgyi

The Map-Reduce computing framework rose to prominence with datasets of such size that dozens of machines on a single cluster were needed for individual jobs. As datasets approach the exabyte scale, a single job may need distributed…

Data Structures and Algorithms · Computer Science 2016-10-31 Riley Murray , Samir Khuller , Megan Chao

In the past years, Interconnection Networks have been used quite often and especially in applications where parallelization is critical. Message packets transmitted through such networks can be interrupted using buffers in order to maximize…

Networking and Internet Architecture · Computer Science 2017-02-28 Stavros Birmpilis , Timotheos Aslanidis

In the past decade Optical WDM Networks (Wavelength Division Multiplexing) are being used quite often and especially as far as broadband applications are concerned. Message packets transmitted through such networks can be interrupted using…

Networking and Internet Architecture · Computer Science 2017-01-10 Timotheos Aslanidis , Stavros Birmpilis

We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…

Data Structures and Algorithms · Computer Science 2025-08-13 Hauke Brinkop , David Fischer , Klaus Jansen

We consider scheduling on identical and unrelated parallel machines with job assignment restrictions. These problems are NP-hard and they do not admit polynomial time approximation algorithms with approximation ratios smaller than $1.5$…

Data Structures and Algorithms · Computer Science 2017-01-26 Klaus Jansen , Marten Maack , Roberto Solis-Oba

The minimization of makespan in open shop with time lags has been shown NP-hard in the strong sense even for the case of two machines and unit-time operations. The minimization of total completion time however has remained open for that…

Computational Complexity · Computer Science 2022-03-25 Wieslaw Kubiak

The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…

Optimization and Control · Mathematics 2023-06-16 Nodari Vakhania , Frank Werner , Alejandro Reynoso
‹ Prev 1 2 3 10 Next ›