English
Related papers

Related papers: Approximation Algorithms for the Open Shop Problem…

200 papers

Assigning jobs onto identical machines with the objective to minimize the maximal load is one of the most basic problems in combinatorial optimization. Motivated by product planing and data placement, we study a natural extension called…

Data Structures and Algorithms · Computer Science 2019-09-27 Klaus Jansen , Alexandra Lassota , Marten Maack

Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing…

Data Structures and Algorithms · Computer Science 2019-10-22 Alexander Mäcker , Friedhelm Meyer auf der Heide , Simon Pukrop

We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job…

Data Structures and Algorithms · Computer Science 2026-01-01 Danny Hermelin , Danny Segev , Dvir Shabtay

We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…

Data Structures and Algorithms · Computer Science 2015-03-20 Leah Epstein , Asaf Levin

The (Non-Preemptive) Throughput Maximization problem is a natural and fundamental scheduling problem. We are given $n$ jobs, where each job $j$ is characterized by a processing time and a time window, contained in a global interval $[0,T)$,…

Data Structures and Algorithms · Computer Science 2026-04-01 Alexander Armbruster , Fabrizio Grandoni , Antoine Tinguely , Andreas Wiese

We consider the problem of finding patrol schedules for $k$ robots to visit a given set of $n$ sites in a metric space. Each robot has the same maximum speed and the goal is to minimize the weighted maximum latency of any site, where the…

Data Structures and Algorithms · Computer Science 2020-07-15 Peyman Afshani , Mark De Berg , Kevin Buchin , Jie Gao , Maarten Loffler , Amir Nayyeri , Benjamin Raichel , Rik Sarkar , Haotian Wang , Hao-Tsung Yang

A problem of minimization of delivery and storage costs of a product is considered under constraints on volumes of delivery from each of the suppliers. It is required to determine optimal volumes and times of product shipments. The problem…

Optimization and Control · Mathematics 2013-11-06 Natalia Burlakova , Vladimir Servakh

One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…

Data Structures and Algorithms · Computer Science 2011-03-22 Ola Svensson

We consider here the MultiBot problem for the scheduling and the resource parametrization of jobs related to the production or the transportation of different products inside a given time horizon. Those jobs must meet known in advance…

Data Structures and Algorithms · Computer Science 2024-01-02 Pierre Bergé , Mari Chaikovskaia , Jean-Philippe Gayon , Alain Quilliot

We are concerned with the problem of scheduling $n$ jobs onto $m$ identical machines. Each machine has to be in operation for a prescribed time, and the objective is to minimize the total machine working time. Precisely, let $c_i$ be the…

Data Structures and Algorithms · Computer Science 2025-07-22 Yi-Ting Hsieh , Mong-Jen Kao , Jhong-Yun Liu , Hung-Lung Wang

An important objective in scheduling literature is to minimize the sum of weighted flow times. We are given a set of jobs where each job is characterized by a release time, a processing time, and a weight. Our goal is to find a preemptive…

Data Structures and Algorithms · Computer Science 2022-08-08 Alexander Armbruster , Lars Rohwedder , Andreas Wiese

We consider a special case of the ordinary NP-hard two-machine flow shop problem with the objective of determining simultaneously a minimal common due date and the minimal number of tardy jobs. In [S. S. Panwalkar, C. Koulamas, An O(n^2)…

Data Structures and Algorithms · Computer Science 2015-03-16 Aleksandar Ilic

In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…

Data Structures and Algorithms · Computer Science 2017-12-07 Klaus Jansen , Marten Maack

The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…

Data Structures and Algorithms · Computer Science 2019-11-28 Kristóf Bérczi , Tamás Király , Simon Omlor

The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…

Data Structures and Algorithms · Computer Science 2021-06-15 Yakov Zinder , Joanna Berlińska , Charlie Peter

We consider two-machine routing open shop problem on a tree. In this problem a transportation network with a tree-like structure is given, and each node contains some jobs to be processed by two mobile machines. Machines are initially…

Computational Complexity · Computer Science 2020-04-09 Ilya Chernykh , Ekaterina Lgotina

In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is…

Data Structures and Algorithms · Computer Science 2021-07-06 Klaus Jansen , Malin Rau

We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…

Data Structures and Algorithms · Computer Science 2015-07-06 Hossein Efsandiari , MohammadTaghi Hajiaghyi , Jochen Koenemann , Hamid Mahini , David Malec , Laura Sanita

In this paper, we will find a pseudopolynomial algorithm to solve $Qm \mid \mid L_{\max}$ and then we will prove that it is impossible to get any constant-factor approximation in polynomial time, and thus also impossible to have a PTAS for…

Data Structures and Algorithms · Computer Science 2020-01-23 Elbert Du , Stan Zhang

We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…

Data Structures and Algorithms · Computer Science 2023-09-22 Sven Jäger , Philipp Warode