Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw…
A 162.5 MHz superconducting half-wave resonator (HWR) with geometry beta of 0.09 is being developed for Injector II of China Accelerator Driven Sub-critical System (CADS) Project at the Institute of Modern Physics (IMP). The HWR section…
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under…
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac…
The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chopping system to perform arbitrary, bunch-by-bunch…
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments.…
The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world's…
The PROMETHEUS Project is ongoing for the design and development of a 4-vane radio frequency quadrupole (RFQ) together with its H+ ion source, a low energy beam transport (LEBT) line and diagnostics section. The main goal of the project is…
The Proton Improvement Plan II (PIP-II) project is a vital upgrade to the Fermilab accelerator complex. The magnet pulse rate of the PIP-II Injection system requires an increase from the current rate of 15 Hz to 20 Hz as well as a roughly…
The Peking University Integral Split Ring Radio Frequency Quadrupole(ISR RFQ) accelerator was constructed in 1999 with a high duty factor 16.7% and repetition frequency 166Hz, and it was able to accelerate N+, O+,O-, C+ and He+ from…
The ISAC 35 MHz RFQ is designed to accelerate ions of A/q up to 30 from 2keV/u to 150keV/u in cw mode. The RFQ structure is 8 meters long and the vane-shaped rods are supported by 19 rings spaced 40 cm apart. An unusual feature of the…
The PEP-II B Factory Low-Level RF System (LLRF) is a fully programmable VXI based design running under an EPICS control environment. Several RF feedback loops are used to control longitudinal coupled-bunch modes driven by the accelerating…
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a…
A second harmonic RF cavity which uses perpendicularly biased garnet for frequency tuning is currently being constructed for use in the Fermilab Booster. The cavity will operate at twice the fundamental RF frequency, from ~76 - 106 MHz, and…
Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules.…
High gradient accelerator injectors have been widely studied throughout the world-leading accelerator facilities. The demand for high frequency cavities have led the Detector, Accelerator and instrumentation laboratory (KAHVELab) in…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
There are applications, which require MeV-range multiple-beams consisting of a large number of identical highly packed beamlets. The multiple-beam RFQ (MB-RFQ) arranged as a matrix array of longitudinal rod-electrodes is appropriate…
The Fermilab Booster is being upgraded under the Proton Improvement Plan (PIP) to be capable of providing a proton flux of $2.25^{17}$ protons per hour. The intensity per cycle will remain at the present operational $4.3^{12}$ protons per…