Related papers: Minimum total weighted completion time: Faster app…
We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job…
We initiate a systematic study of approximation schemes for fundamental optimization problems on disk graphs, a common generalization of both planar graphs and unit-disk graphs. Our main contribution is a general framework for designing…
The interval subset sum problem (ISSP) is a generalization of the well-known subset sum problem. Given a set of intervals $\left\{[a_{i,1},a_{i,2}]\right\}_{i=1}^n$ and a target integer $T,$ the ISSP is to find a set of integers, at most…
We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…
We consider a classical scheduling problem on $m$ identical machines. For an arbitrary constant $q>1$, the aim is to assign jobs to machines such that $\sum_{i=1}^m C_i^q$ is minimized, where $C_i$ is the total processing time of jobs…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
We give the first polynomial-time approximation scheme (PTAS) for the stochastic load balancing problem when the job sizes follow Poisson distributions. This improves upon the 2-approximation algorithm due to Goel and Indyk (FOCS'99).…
We develop a framework for obtaining polynomial time approximation schemes (PTAS) for a class of stochastic dynamic programs. Using our framework, we obtain the first PTAS for the following stochastic combinatorial optimization problems:…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the…
The main results of this paper provide an Efficient Polynomial-Time Approximation Scheme (EPTAS) for approximating the genus (and non-orientable genus) of dense graphs. By dense we mean that $|E(G)|\ge \alpha |V(G)|^2$ for some fixed…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
In the Closest String problem one is given a family $\mathcal S$ of equal-length strings over some fixed alphabet, and the task is to find a string $y$ that minimizes the maximum Hamming distance between $y$ and a string from $\mathcal S$.…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
We study approximation algorithms for the problem of minimizing the makespan on a set of machines with uncertainty on the processing times of jobs. In the model we consider, which goes back to~\cite{BertsimasS03}, once the schedule is…
This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the…
We study the budgeted versions of the well known matching and matroid intersection problems. While both problems admit a polynomial-time approximation scheme (PTAS) [Berger et al. (Math. Programming, 2011), Chekuri, Vondrak and Zenklusen…
We present a $\sqrt{e}/(\sqrt{e}-1)$-approximation algorithm for the nonpreemptive scheduling problem to minimize the total weighted completion time of jobs on a single machine subject to release dates and precedence constraints. The…
We consider the SUBSET SUM problem and its important variants in this paper. In the SUBSET SUM problem, a (multi-)set $X$ of $n$ positive numbers and a target number $t$ are given, and the task is to find a subset of $X$ with the maximal…
We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This…